• The controlled crucial works for this contract section is the construction for the prestressed concrete continuous combined box beam.

    本合同段控制性关键工程是预应力砼连续组合箱梁的施工。

    youdao

  • The paper summed up the pile foundation construction technology in the 3-contract section and discussed the key steps for quality control on cast-in-place pile.

    总结了京沪高铁三标段三工区桩基施工技术,并对灌注桩施工质量控制的几个关键环节进行了探讨。

    youdao

  • This paper introduces the construction practice of the high piers and columns of No. 12 Contract Section of Xiangyang-Shiyan Expressway.

    本文就襄十高速公路第12合同段高墩柱施工实践谈几点体会。

    youdao

  • This paper presents the construction method of reef blasting of Contract Section C1 in Downstream Regulation Engineering of Xijiang River, which may serve as a reference for similar projects.

    介绍西江下游航道整治C1合同段蟠龙石炸礁工程施工方法,可为类似工程提供借鉴。

    youdao

  • This paper presents the construction method of reef blasting of Contract Section C1 in Downstream Regulation Engineering of Xijiang River, which may serve as a reference for similar projects.

    介绍西江下游航道整治C1合同段蟠龙石炸礁工程施工方法,可为类似工程提供借鉴。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定