Developed a united optimal operating aid decision system software with web-based method for the basin cascade hydropower plants.
研制开发了网络环境下的流域梯级水电站优化调度辅助决策系统软件。
参考来源 - 流域梯级水电站联合优化调度辅助决策系统研究·2,447,543篇论文数据,部分数据来源于NoteExpress
The river basins cascade hydropower development may cause the cumulative effects on ecology and environment.
流域的梯级开发对生态环境产生累积效应。
Improved Particle Swarm Optimization is applied to short-term optimal scheduling of the cascade hydropower plants.
应用改进粒子群算法求解梯级水电站短期优化调度问题。
Longshou II hydropower station is the seventh cascade hydropower station of the hydropower cascade planning for Heihe.
龙首二级水电站是黑河水能梯级规划的第七座梯级电站。
应用推荐