The river basins cascade hydropower development may cause the cumulative effects on ecology and environment.
流域的梯级开发对生态环境产生累积效应。
Improved Particle Swarm Optimization is applied to short-term optimal scheduling of the cascade hydropower plants.
应用改进粒子群算法求解梯级水电站短期优化调度问题。
Longshou II hydropower station is the seventh cascade hydropower station of the hydropower cascade planning for Heihe.
龙首二级水电站是黑河水能梯级规划的第七座梯级电站。
The results indicate that the cascade hydropower development has significant impact on the vegetation environment in Qingjiang river basin.
研究表明:水电梯级开发对清江中下游地区的植被覆盖环境影响比较大。
A model of mid-long term optimal dispatching of cascade hydropower stations is established and a solution is given using progressive optimality algorithm.
建立了梯级水电站中长期联合优化调度模型,并采用逐步优化算法对其进行求解。
Taking the cascade hydropower stations of the middle Jinsha River as an example, a reasonable optimal dispatching solution is obtained through calculation.
以金沙江中游梯级水电站群为例,通过计算,得到了合理的联合优化调度方案。
The access road of cascade hydropower stations will often get across existed reservoir region, and the sediment access will be inevitably built on reservoir alluvium.
梯级水电站的对外公路通常会经过已经建好的水库库区,在公路修建中不可避免地遇到水库淤积泥沙路段。
The effectiveness of this algorithm is verified by the sample application, thus a new method is provided for the short-term optimization problem of cascade hydropower stations.
通过实际算例验证了该算法的有效性,从而为梯级水电厂的短期优化调度问题提供了一种新的求解途径。
The system combines flood forecasting, power generation optimization, data reorganization and many functions so on and can make joint dispatching of cascade hydropower stations.
该系统集成了洪水预报、水库调度、发电优化、数据整编等各方面功能,并可进行梯级电站联合调度。
Based on the principle of dynamic programming, a mathematical model of sequencing programming of cascade hydropower stations is established and its computation method is presented.
本文根据动态规划原理,建立了梯级电站开发程序优化的数学模型,提出了相应的计算方法。
This protection information system with a network function has been put into operation, and the operation and management level of relay protection of cascade hydropower plants is improved.
该网络化的保护信息系统已在实际工作中发挥作用,提高了梯级水电站继电保护现场运行管理的水平。
Principles, compensation period, a variety of compensation computation methods and formulas for reservoir regulation benefits and compensations among cascade hydropower stations are studied here.
针对梯级水电站间水库调节效益补偿的原则、补偿时段、补偿的各类计算方法和公式进行研究。
This paper puts forward the unified prices of electricity sent into grid for cascade hydropower stations and discusses the necessity and feasibility of the unified price of electricity sent into grid.
提出了流域梯级水电站统一上网电价的观点,并论述统一上网电价的必要性和可行性。
The Hydropower Station is the key project in the cascade development in the middle and lowers of Lancang River, with complex geological condition of high rock slope at the intake.
某水电站是澜沧江中、下游梯级开发的关键工程,其进水口高边坡地质条件复杂。
This thesis hopes to offer the reference for hydropower cascade development and navigation planning in the Jinsha river.
为金沙江流域的水电梯级开发和航运规划提供参考。
A method of calculation for optimizing the daily operation of hydropower cascade is suggested.
本文提出了水电厂梯级日优化运行的解算方法。
The hydropower cascade exploitation of a river basin inevitably causes the spatiotemporal distribution of water resource to change.
水电梯级开发必然会导致水资源的时空分布发生改变。
On rivers rich in hydropower potential, multiple-purpose cascade development in planned way shall be practiced.
在水能丰富的河流,应当有计划在进行多目标梯级开发。
To construct this hydropower station is a new milestone in the cascade development of Dadu River.
瀑布沟水电站的开工建设是大渡河梯级开发的一个新的里程碑。
The computer monitoring and control system for Jinshuitan Hydropower Station is standard H9000 system but that for cascade regulation and Shitang Hydropower Station is SSJ 3000 system.
紧水滩电站计算机监控系统采用标准的H9000系统,梯调和石塘站调采用SSJ3000型计算机监控系统。
The computer monitoring and control system for Jinshuitan Hydropower Station is standard H9000 system but that for cascade regulation and Shitang Hydropower Station is SSJ 3000 system.
紧水滩电站计算机监控系统采用标准的H9000系统,梯调和石塘站调采用SSJ3000型计算机监控系统。
应用推荐