Engineers will conduct a block by block inspection of the monument's exterior over the next five days.
未来五天,工程人员将逐一认真检查纪念塔的外部。
Non-watertight weld joints and fillet welding for stiffening member shall be painted after block inspection.
加强构件的非水密焊接接合和填角焊应该在检查完分段后进行喷漆。
All scaffold should be marked by blue marker before block final inspection, and the marker should be round and easily found.
大厦最终检查之前,所有的脚手架应该用蓝色记号标出,记号应呈圆形且易于发现。
应用推荐