Engineers will conduct a block by block inspection of the monument's exterior over the next five days.
未来五天,工程人员将逐一认真检查纪念塔的外部。
Non-watertight weld joints and fillet welding for stiffening member shall be painted after block inspection.
加强构件的非水密焊接接合和填角焊应该在检查完分段后进行喷漆。
Non-watertight weld joints and fillet welding for stiffening member shall be painted after block inspection.
加强构件的非水密焊接接合和填角焊应该在检查完分段后进行喷漆。
应用推荐