Engineers will conduct a block by block inspection of the monument's exterior over the next five days.
未来五天,工程人员将逐一认真检查纪念塔的外部。
Non-watertight weld joints and fillet welding for stiffening member shall be painted after block inspection.
加强构件的非水密焊接接合和填角焊应该在检查完分段后进行喷漆。
All scaffold should be marked by blue marker before block final inspection, and the marker should be round and easily found.
大厦最终检查之前,所有的脚手架应该用蓝色记号标出,记号应呈圆形且易于发现。
Block in the transport process protection coatings to avoid mechanical damage. If suffer much, the all mechanical damage should be repaired before final inspection.
分段在运送过程中注意保护外壳的涂层,尽量避免机械损伤;若有较多的机械碰伤,必须在分段完工前修补结束后方可报验。
All scaffold should be marked by blue marker before block final inspection, the marker should be rotundity and easily was found.
分段完工前,将脚手架接触处用蓝色记号笔标出,圆形且易于发现。
Can identify suspect parts and nonconformity parts during inspection and make a mark for whole lot. Should block suspect lots and report to TQ engineer and supervisor.
在检验过程中能鉴别可疑产品和不合格产品,并对可疑批次进行标识锁定,及时报告产品质量工程师和生产线主管。
Can identify suspect parts and nonconformity parts during inspection, and make a mark for whole lot. Should block suspect lots and report to TQ en.
在检验过程中能鉴别可疑产品和不合格产品,并对可疑批次进行标识锁定,及时报告产品质量工程师和生产线主管。
Inspection scheme of offshore platform structure ultrasonic phased array was also presented, and the reference block of offshore platform structure was detected by this system.
提出海洋平台结构超声相控阵检测方案,并使用该系统在对比试件上进行试验。
All scaffold should be marked by white marker before block final inspection, the marker should be rotundity and easily was found;
分段完工前,外壳上脚手架接触处用白色记号笔标出,圆形且易于发现;
Inspection air pressure test(with water head) for No1. water ballast tank(No15 block).
No1压载水舱(No.15分段)气压试验(压头试验)检查。
Inspection air pressure test(with water head) for No1. water ballast tank(No15 block).
No1压载水舱(No.15分段)气压试验(压头试验)检查。
应用推荐