... bid bond(tender bond,tender guarantee),投标保函 bid cost(cost of tendering),投标费用 bid form(tender form),投标格式 ...
基于26个网页-相关网页
Per Bid Cost 每个投标成本 ; 每次投标成本
bid cost rate 招投标成本率
bid cost price 投标成本价
awarded bid cost 中标成本
bid cost comparison 报价成本比
bid price below cost 低于成本价
Maximum Cost-Per-Click Bid 关键字竞价最大值
The partner selection problem with bid cost and completion time factors with a due date constraint is a fundamental problem in virtual enterprises.
具有项目投标价格和完工时间因素的带工期约束的伙伴选择问题是企业动态联盟的基本问题,证明了该问题是NP完全问题。
The certainty model of the risk of tender for engineering construction, bid cost comparison and tender probability on uncertainty measure is established.
给出了未确知测度、置信度的概念,建立了基于未确知测度的工程建设投标风险,报价成本比,中标概率确定模型。
It takes Chongqing as a case, using market investigation and analytic induction, to measure the average bid cost, average bidder cost and the whole project bid cost.
采用市场调查和归纳分析法,测算出企业平均招标成本、投标成本和项目招投标成本、招投标成本率。