期望本论文的研究,有助于提高工程项目风险管理水平,降低建筑工程施工效益风险损失,为完善我国工程风险理论研究做出贡献。
Studies of the thesis are expected to make for improving level of risk management and reducing loss of construction-benefit, also contribute to perfect theory of risk management.
节省材料80%左右,不停机就可调整所切面条的宽度,减轻了劳动强度,提高工效,从而降低生产成本。
Saves about material 80%, the engine off cannot adjust cut the width of the noodles, reduced the labor intensity, enhances the work efficiency, thus reduces the production cost.
工效降低索赔是一种比较特殊的索赔,工程实践中一般只要求工期延长,不要求费用补偿。
As a kind of special claim, claims of loss efficiency usually claimed for extension of time, and seldom for financial compensation.
应用推荐