帽梁(top beam,capping beam)通俗称盖梁,也称冠梁。
混凝土的垂直运输、高桥墩顶偏心控制、帽梁施工是该工程施工的难点。
Concrete vertical transportation, eccentricity control of pier top and construction of top hat beam are the difficult points for present project.
支架形式的选择,应考虑现场施工条件与帽梁的高度还应考虑经济成本和尽量能就地取材。
The choice form, should consider the spot construction term and the high degree of the hat beam, should still consider the economic costs with can acquire necessary material locally to the best.
根据内力测试结果,对基坑短边内不同位置桩、短边与长边内桩的帽梁受力进行了对比分析,得出了平面位置对桩帽梁受力的影响。
The effect of pile's place upon top beam's internal forces by comparing the top beams' stress in short-side with that in the long-side and in the inner-side of short-side was also studied.
应用推荐