• 混凝土的垂直运输、高桥墩顶偏心控制、帽梁施工是该工程施工的难点。

    Concrete vertical transportation, eccentricity control of pier top and construction of top hat beam are the difficult points for present project.

    youdao

  • 根据内力测试结果,对基坑短边内不同位置桩、短边与长边内桩的帽梁受力进行了对比分析,得出了平面位置对桩帽梁受力的影响。

    The effect of pile's place upon top beam's internal forces by comparing the top beams' stress in short-side with that in the long-side and in the inner-side of short-side was also studied.

    youdao

  • 通过分析墩帽及基础梁(拉梁)的受力状态,提出了墩帽及基础梁(拉梁)的设计方法。

    By analysing the bearing condition of pier cap and foundation beam (tie beam), this article gives the design approach of pier cap and foundation beam (tie beam).

    youdao

  • 本实用新型涉及一种穿筋式钢管混凝土柱-帽型组合梁连接节点,属于结构工程领域。

    The utility model relates to a steel bar reinforced connection node between a steel tube-cement column and a cap-style composite beam, and pertains to the constructional engineering field.

    youdao

  • 本实用新型涉及一种穿筋式钢管混凝土柱-帽型组合梁连接节点,属于结构工程领域。

    The utility model relates to a steel bar reinforced connection node between a steel tube-cement column and a cap-style composite beam, and pertains to the constructional engineering field.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定