如果他们利用了所有可用的资源,并且仍旧落后于进度,那么他们将求助于减少项目的特性列表,而仍旧优化对客户的价值。
If they have utilized all available resources and are still behind schedule, they will turn to reducing the feature list of the project while still optimizing value to the customer.
构建阶段在某种意义上说是一个制造过程,在此阶段要强调对资源的管理和对操作的控制,用来优化成本、进度和质量。
The Construction phase is in some sense a manufacturing process, where emphasis is placed on managing resources and controlling operations to optimize costs, schedules, and quality.
这里的一个小小优化是在每个缩略图上都有一个小进度条,显示你在各个站点上逗留的时间长短。
A nice addition here is a little bar in each thumbnail that shows how much time you've spent on each site.
应用推荐