如果他们利用了所有可用的资源,并且仍旧落后于进度,那么他们将求助于减少项目的特性列表,而仍旧优化对客户的价值。
If they have utilized all available resources and are still behind schedule, they will turn to reducing the feature list of the project while still optimizing value to the customer.
构建阶段在某种意义上说是一个制造过程,在此阶段要强调对资源的管理和对操作的控制,用来优化成本、进度和质量。
The Construction phase is in some sense a manufacturing process, where emphasis is placed on managing resources and controlling operations to optimize costs, schedules, and quality.
这里的一个小小优化是在每个缩略图上都有一个小进度条,显示你在各个站点上逗留的时间长短。
A nice addition here is a little bar in each thumbnail that shows how much time you've spent on each site.
停下来、重构、稍微落后于特性、专注于少量特性、不赶进度而是优化代码,如此循环往复,却从来不受益;这样的状况完全有可能。
It is entirely possible to stop, refactor, be a little behind on features, slam in a few features, not catch up but screw up the code, and loop forever, never getting benefit.
工程机械施工机群优化配置与调度决定着整个工程的进度、质量和效益。
Optimal configuration and dispatch of construction machinery group becoming the key factor that influencing the process, quality and economy of these projects.
在编制计划时可以很方便地调整、优化施工进度计划,在施工控制阶段,可以直接指挥生产,控制施工进度。
It may be used to adjust and optimize construction schedule planning, also manage production and control construction schedule in construction controlling stage.
平衡客户需求和工厂产能,优化生产计划安排并追踪生产进度确保高水平出货达成率并维持分销中心合理库存(FDS)。
Leverage customer demand and plant production capacity. Optimize production plan and track production execution to ensure high delivery compliance performance and suitable DC inventory (FDS).
网络计划进度优化是工程项目管理的关键性问题之一。
Network planning schedule optimization is one of the pivotal issues in engineering project management.
当前对于项目进度优化的研究集中于以最小的资源增量,实现既定的优化工期。
The current studies on schedule optimization aim at achieving the optimal goals by least additional resources.
项目进度优化调整策略。
较大的挡土墙工程,经优化设计后可降低工程造价且能加快施工进度,使用方便,视觉舒适。
Some large project of retaining wall can improve construction process, economic values, and visual comfort by design optimization.
本文重点研究了工程项目建设期进度费用优化中资金的时间价值以及工程项目运营收益对项目建设期进度费用优化的影响。
The time value of capital in schedule cost optimization and the influence of the income of running period to schedule cost optimization of engineering project is mainly studied in this paper.
结果表明,考虑进度风险因素的优化模型是科学合理的。
Case study shows that the resource reallocation model considering schedule risk factors is reasonable.
文中着重研究了项目管理在成本、质量和进度三个方面的优化问题,分别提出了优化的方法。
The research is mainly focused on the optimization of Project management with Cost, Quality and Progress, puts forward the method of optimization.
在保证工程项目质量的前提下,项目成本与进度的优化就成了项目管理成功与否的决定因素。
In the premise of the high quality of engineering project, the optimization between the project cost and construction schedule determines the successful of a project management.
综合应用进化算法和计算机技术,分两阶段对采掘进度计划实现优化。
Evolutionary algorithm and computer technology are used in combination in optimizing the mining scheduling in two phases.
对各项活动的性质、活动与各活动之间的逻辑关系进行再分析,通过调整活动安排以达到优化项目进度的目的。
Reanalyzes the nature of work and logical relation between each work, through adjust arrangement of work to achieves the goal of optimized project progress.
在对网络优化技术系统分析的基础上,指出仅靠常规手段将网络优化技术应用于进度管理的复杂之处。
On the basis of systemic analyzing on network optimization technique, we can see what is complicated to apply it into process management, only by conventional means.
随后分别从承包商和业主各自的角度构建了多模式项目支付进度的优化模型;
Then the optimization models of multi-mode project payment scheduling problems(MPPSP) are constructed from the contractor's and the client's viewpoints respectively.
针对露天矿采掘进度计划优化编制问题,建立了一个数学模型,同时较充分地考虑了作业条件下的模型建立和问题的处理。
An optimized mining plan model was presented for opencast mines. During the development of the model, mining construction was given full consideration.
本文针对水电工程施工进度的优化及控制方法进行了理论分析与应用研究。
In this paper, optimization of hydropower project construction schedule and control methods of theoretical analysis and application.
同时,缺少切实有效的施工进度优化理论与方法也制约着施工管理水平的提高。
At the same time, the lack of effective progress of optimization theory and methods of construction also restricts the construction management levels.
并通过施工总进度分析与优化、主要业务流程仿真运行改进,验证了该方法的可行性及实效性。
And the progress of construction through analysis and optimization, simulation run major business process improvement, test the feasibility of the method and effectiveness.
在这个简化的示例中,我们有一个包括10项活动的进度计划。各项活动都经资源平衡,以保证对资源的优化利用。
In this overly simplified example, we have a schedule with 10 activities that have been leveled to ensure optimal use of assigned resources.
指出在考虑施工活动持续时间不确定的条件下,开展施工网络进度计划和优化研究,具有实际意义;
The research on risks and optimization of the construction network program is of significance when the lasting time of the construction is uncertain.
同时,结合某企业另一案例,用资源平衡法优化项目进度计划保证项目的最终完成并做出评价。
Meanwhile, combined with another example of XX Company, the evaluation of the adjustment has been done with resource balance method to optimize the accomplishment of projects.
同时,结合某企业另一案例,用资源平衡法优化项目进度计划保证项目的最终完成并做出评价。
Meanwhile, combined with another example of XX Company, the evaluation of the adjustment has been done with resource balance method to optimize the accomplishment of projects.