混凝土的垂直运输、高桥墩顶偏心控制、帽梁施工是该工程施工的难点。
Concrete vertical transportation, eccentricity control of pier top and construction of top hat beam are the difficult points for present project.
根据内力测试结果,对基坑短边内不同位置桩、短边与长边内桩的帽梁受力进行了对比分析,得出了平面位置对桩帽梁受力的影响。
The effect of pile's place upon top beam's internal forces by comparing the top beams' stress in short-side with that in the long-side and in the inner-side of short-side was also studied.
通过分析墩帽及基础梁(拉梁)的受力状态,提出了墩帽及基础梁(拉梁)的设计方法。
By analysing the bearing condition of pier cap and foundation beam (tie beam), this article gives the design approach of pier cap and foundation beam (tie beam).
本实用新型涉及一种穿筋式钢管混凝土柱-帽型组合梁连接节点,属于结构工程领域。
The utility model relates to a steel bar reinforced connection node between a steel tube-cement column and a cap-style composite beam, and pertains to the constructional engineering field.
本实用新型涉及一种穿筋式钢管混凝土柱-帽型组合梁连接节点,属于结构工程领域。
The utility model relates to a steel bar reinforced connection node between a steel tube-cement column and a cap-style composite beam, and pertains to the constructional engineering field.
应用推荐