• 混凝土垂直运输桥墩偏心控制施工工程施工的难点

    Concrete vertical transportation, eccentricity control of pier top and construction of top hat beam are the difficult points for present project.

    youdao

  • 支架形式选择,考虑现场施工条件高度还应考虑经济成本尽量就地取材。

    The choice form, should consider the spot construction term and the high degree of the hat beam, should still consider the economic costs with can acquire necessary material locally to the best.

    youdao

  • 根据内力测试结果,对基坑短边内不同位置、短边长边内桩的受力进行对比分析,得出了平面位置帽梁受力的影响。

    The effect of pile's place upon top beam's internal forces by comparing the top beams' stress in short-side with that in the long-side and in the inner-side of short-side was also studied.

    youdao

  • 通过分析基础(拉)受力状态提出了墩及基础(拉)的设计方法

    By analysing the bearing condition of pier cap and foundation beam (tie beam), this article gives the design approach of pier cap and foundation beam (tie beam).

    youdao

  • 铁路敞车(儿钢)铁路运输货车主要关键构件,原本由牌号为09v强度制造

    Railway truck, s beam is the main essential component of railway transportation vehicle, it was manufactured with low intensity steel in type 09v.

    youdao

  • 实用新型涉及一种穿钢管混凝土-组合连接节点属于结构工程领域

    The utility model relates to a steel bar reinforced connection node between a steel tube-cement column and a cap-style composite beam, and pertains to the constructional engineering field.

    youdao

  • 实用新型涉及一种穿钢管混凝土-组合连接节点属于结构工程领域

    The utility model relates to a steel bar reinforced connection node between a steel tube-cement column and a cap-style composite beam, and pertains to the constructional engineering field.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定