下一步将是测试吊杆的强度。
一架起重机的吊杆伸入二号舱,吊出一辆上海牌轿车。
One crane dipped into No. 2 hold and came up with a "Shanghai" sedan.
悬索桥有下列构件:柔性索缆、索塔、锚固件、吊杆、桥面、加劲桁架。
The components of a suspension bridge are: flexible cables, towers, anchorages, suspenders, deck and stiffening trusses.
每根吊杆的安全工作负荷是5吨。
它最显著的特点就是其庞大的吊杆。
让吊杆在安全负荷下工作。
它由钢制吊杆与钢缆连接。
请把吊杆甩到外档去,我们要用岸吊作业。
Please swing the derricks outboard. We want to use the shore crane.
放下,绑牢吊杆并报告。
将吊笼放到底座上,装上吊杆及手摇起重机。
Put the suspension coop on the base, install suspension shaft and hand crane.
这些吊杆是用来为过路火车通过而拦住交通的。
请把吊杆甩到外档。
吊杆顶在码头上方。
吊杆顶在货舱上方。
自生杂散电流会严重腐蚀悬挂式阳极的金属吊杆。
Self-produced stray current can severely corrode the metallic boom of hanging type anode.
有热伸长的管道吊杆,应向热膨胀的反方向偏移。
Heating stretching pipe hanger should be fixed oppositely to the direction of the thermal expansion.
你把吊杆降低一点好吗?这样便于前部货物的积载。
Will you lower the boom a little bit? This will facilitate the stowage of fore part cargo.
现在的问题是能否用你们的重吊杆搬这两台掘土机。
Now the question is whether we can take the two excavators with your jumbo boom.
横担采用轻钢龙骨,吊杆采用全牙螺杆,选用规格见下表。
Supported by metal frame, boom using screw-wide teeth, use specifications shown in the table below.
桁拱桥也可通过调节吊杆的拉力来使桁间位移进一步协调。
Truss arch bridge can also get better displacement coordination among three trusses by adjusting the tension of hanger rod.
在图1-38中,两根吊杆的下端在加载之前位于同一高度上。
The lower ends of the two hangers in Fig. 1-38 were at the same elevation before the loads were applied.
常规出厂配置为吊杆式安装,如需其它安装方式,订货时请注明。
Conventional factory configuration for the boom type installation, if you need other installation methods, please specify when ordering.
第三部分介绍了舞台吊杆控制系统的实现,这是系统的核心部分。
Part III introduced stage bar control system's achieved; this is the core of the system.
系杆拱桥中吊杆索长均较短,对于短索索力的计算存在相当的难度。
The suspender cables in tie bar arch bridge are short, so it is rather difficult to calculate the short cable tension.
同时配有一对手动或电动悬臂吊杆,用于拆卸模具和装卡大型工件。
In addition, a pair of manual or electric-operated booms is provided for disassembling the mould and mounting the large work pieces.
分别以位移、弯矩及整体受力状态为控制目标来确定成桥时吊杆内力。
The internal force of the hanger rods when completing the bridge shall be determined by displacement, bending movement and the integral forced status as the control objective.
分别以位移、弯矩及整体受力状态为控制目标来确定成桥时吊杆内力。
The internal force of the hanger rods when completing the bridge shall be determined by displacement, bending movement and the integral forced status as the control objective.
应用推荐