• 方法公路坐标计算可以应用

    The calculating methods of middle stake coordinates also can be used in the highway.

    youdao

  • 本文介绍一种不放线路中桩测绘横断面方法

    A method of surveying cross section map is introduced unwanted center line piles.

    youdao

  • 开挖过程出现沿隧道推进方向往复位移

    During tunneling, there are back and forth displacements at pile top along the direction in which the tunnel is pushed forward.

    youdao

  • 刚度分析例说明一方法的适用性。

    Numerical examples for the stiffness analyses of the pile in layered soil definitely confirm the above conclusions.

    youdao

  • 然后根据导线进行道路设,同时进行测量。

    The second , the surveys of the road′s middle pile are measured in line with the line′s points then the surveys of horizonal mid

    youdao

  • 针对瞬态条件下存在缺陷的解问题 ,研制了分析程序。

    The software is developed for the vibration response to exciting force on defective piles in homogeneous soil.

    youdao

  • 通过编程计算出坐标,可便于全站仪、GPSRTK坐标放样。

    By program, it would count every middle and side stakes coordinate of GPS, RTK.

    youdao

  • 公路工程施工,公路线形一般控制,公路宽度是用钢尺中桩两侧丈量

    In the construction of the highway project, the highway line is generally controlled by the middle stakes and the width of highway is measured with a steel ruler from the middle stakes to both sides.

    youdao

  • 采用动力克尔地基模型推导了层状介质单元函数矩阵单元刚度矩阵。

    The shape function matrices and the element stiffness matrices of the pile elements in layered media are derived by adopting the Beam - On - Dynamic - Winkler - Foundation model.

    youdao

  • 饱和粘土地基过程中桩土挤压所引起周土体孔隙压力效应非常显著的。

    The excess pore water pressure of saturated soft clay foundation caused by pile pushing is obvious.

    youdao

  • 通过参数影响分析研究发现,成刚度主要上部土层动力特性及性质影响;

    The results indicate that dynamic characteristics of upper layer soil are major factors that affect the complex stiffness of pile.

    youdao

  • 提出一种无需放样路线无需测定横断面方向导线点上直接放样路线边线方法

    A new method which neither center stakes nor cross - sectional directions about route layout side slope stakes from traverse stations, is discussed in this paper.

    youdao

  • 该文介绍了公路测量导线概念,提出了公路测量导线为基线的支进行公路中桩放样。

    In this paper, the concept of highway measure traverse line is introduced and a new offset method based on measure traverse line is brought forward.

    youdao

  • 本文介绍了极坐标放样线路曲线中桩放样元素计算给出了所编程序基本框架

    This paper discusses the method of how to calculate the laying-out elements of middle-stake and side-stake of the route curve. And the basic frame of the calculation procedure is also given.

    youdao

  • 软弱地基基础研究一直岩土工程重要课题,也是土木工程设计的一项关键技术。

    The behavior of pile raft foundation in soft soil is a very important problem in geotechnical engineering.

    youdao

  • 提出种在导线点上直接放样路线无需放样路线方法生产实践好的效果。

    A method of route surveys from traverse stations, without need of center line, is put forward. It demontrates high efficency in practice.

    youdao

  • 本文介绍一种不放线路中桩测绘横断面方法方法简单方便灵活,提高作业效率工作质量

    A method of surveying cross section map is introduced unwanted center line piles. the method is simple and convenient, and can raise operational efficiency and work quality.

    youdao

  • 压缩试验得到沉降端沉降之差求得,群端沉降由分层总和计算

    The compression of the pile in the pile group can be determined by static load test. The settlement of the pile toe is calculated by layer wise summation method.

    youdao

  • 挤密挤密成孔过程中桩土体应力变化随应力变化发生的土体挤效果理论研究不是很多

    There is few theoretical analysis and study about the soil stress variation and the soil compacted effect between piles when making holes.

    youdao

  • 结果表明,饱和介质瑞利横向响应波的频率、土介质性质—土刚度等因素的影响。

    The Results indicate that the horizontal response of pile to Rayleigh wave is affected by frequency, character of soil medium, pile-soil rigidity ratio.

    youdao

  • 公路常规勘测设计工作切线支距一种常用放样方法方法以路线切线为基线,使用条件受到限制。

    On regular highway reconnaissance work the tangent offset method is the most common one on highway route center stake layout but this method is limited because of route tangent as baseline for offset.

    youdao

  • 计算结果表明,该方法同实测结果吻合得较好。方法突出优点可以考虑中桩相互作用关系。

    The advantage of this method is that the interaction of pile and pile, and pile and soil can be considered.

    youdao

  • 如何提高机械施工质量基础上,还能够大幅度地提高工作效率已成为在工程实际中桩工机械亟待解决关键技术问题

    The key technical problems of the Stake-Frame that improve the construct quality and promote the working efficiency in the practical projects are needed to solve urgently.

    youdao

  • 第二首先简单介绍了深基坑工程中桩支护结构原理特点分类现行规程推荐的单支点锚支护结构的计算方法等情况。

    In the second chapter, principium of pile-anchor retaining structure is firstly introduced, together with its trait, classification and calculating method in the current specification.

    youdao

  • 美满的婚姻夫妻双方共同致力于解决出现任何问题

    In a good marriage, both husband and wife work hard to solve any problems that arise.

    《柯林斯英汉双解大词典》

  • 昨天女孩涉及撞车事故丧生

    A girl was killed yesterday in a crash involving a stolen car.

    《牛津词典》

  • 卡内基用一又一故事阐明人际关系获得最大好处的方法

    Carnegie USES anecdote after anecdote to illustrate the best way to make the most of human relations.

    youdao

  • 游戏开始前玩家必须确定比赛过程是否可以“丢弃牌。

    Players must decide at the start of the game whether anyone may look through the discard pile while playing.

    youdao

  • 游戏开始前玩家必须确定比赛过程是否可以“丢弃牌。

    Players must decide at the start of the game whether anyone may look through the discard pile while playing.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定