• 主梁立模标高斜拉张拉索力主动修正问题进行分析讨论

    Furthermore, the analysis and discussion have been done on the problem of making an active correction to the formwork erection elevation of the main beam and cable force.

    youdao

  • 本文综合考虑影响施工高程控制相关因素,确立悬臂浇筑各阶段立模标高,并对结果进行了修正。

    The paper expounds the factors concerned on the height control, makes the correct height points of separate cantilever segments. The results are amended according to the relevant factors.

    youdao

  • 同时,针对该桥施工进行应力、线形温度监控,综合分析给出立模标高,确保成桥线形内力状态满足设计要求

    The erection elevations of formwork for segment concrete were given by comprehensive analysis to ensure that the geometry and the internal force state meet the design requirements.

    youdao

  • 零部件组立图的做成,跟进全程参与公司体系建立等等

    I am responsible for working out parts drawing and assembly drawing as well as tracing mold testing. I have taken part in the whole company's system establishment course.

    youdao

  • 人性化设计零部生产另外互换100%容易依据不同随时改变

    D. Humanized design group legislature, each parts and mold production, in addition to 100% more likely to swap, and are subject to change based on different filter material.

    youdao

  • 人性化设计零部生产另外互换100%容易依据不同随时改变

    D. Humanized design group legislature, each parts and mold production, in addition to 100% more likely to swap, and are subject to change based on different filter material.

    youdao