• 为实桥施工过程中每一节段施工时立模标高的确定提供了合理的依据。

    This provides a reasonable basis for the elevation in every construction phase in reality.

    youdao

  • 并对主梁立模标高和斜拉索的张拉索力的主动修正问题进行了分析和讨论。

    Furthermore, the analysis and discussion have been done on the problem of making an active correction to the formwork erection elevation of the main beam and cable force.

    youdao

  • 本文综合考虑影响施工高程控制的相关因素,确立了悬臂浇筑各阶段的立模标高,并对结果进行了修正。

    The paper expounds the factors concerned on the height control, makes the correct height points of separate cantilever segments. The results are amended according to the relevant factors.

    youdao

  • 同时,针对该桥施工进行应力、线形和温度监控,综合分析给出节段立模标高,确保了成桥线形和内力状态满足设计要求。

    The erection elevations of formwork for segment concrete were given by comprehensive analysis to ensure that the geometry and the internal force state meet the design requirements.

    youdao

  • 零部件图及组立图的做成,试模的跟进,全程参与了公司体系的建立等等。

    I am responsible for working out parts drawing and assembly drawing as well as tracing mold testing. I have taken part in the whole company's system establishment course.

    youdao

  • 零部件图及组立图的做成,试模的跟进,全程参与了公司体系的建立等等。

    I am responsible for working out parts drawing and assembly drawing as well as tracing mold testing. I have taken part in the whole company's system establishment course.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定