施工准备应充分,施工路段桩号位置找准确。放样应精确,误差在规定范围内。
Construction should be fully prepared, the construction section of the pile position to find accurate. Lofting should be accurate, the error in the specified range.
在公路的施工中,为了准确地控制施工标高,必须对加密桩号的施工标高进行计算。
In the highway construction, it must be to compute the construction elevation of the encrypted stake Numbers for exactly controlling the construction elevation.
南岸连接段地基土主要由黄土组成,在桩号1+200以南存在一层软塑状土,强度低,是影响渠坡稳定的关键性土层。
The foundation soil in connection section on southern bank is mainly composed of loess. At the south of section marked 1+200, there is …
应用自平衡法对京杭运河某特大桥14号墩两根大直径超长桩的承载力进行检测。
The bearing capacity of two super-long piles of No. 14 pier of an extra-long bridge across Jinghang Canal are detected with self-balanced loading testing method.
通过对计算结果的分析,讨论了黄河口五号桩地区的波浪传播特性。
Through analysis of the calculation results, the property of wave propagation in the Yellow River region is discussed.
介绍北京地铁5号线3根试验桩采用自平衡法进行静载试验的情况。
This paper presents the static loading test conducted with 3 piles in the manner of self-balance for the Beijing metro line 5.
我公司顺利中标胜利6号自升式钻井平台改装项目,改装期为4个月,主要工作内容为更换平台圆柱型桩腿。
CIMC Raffles won the repair bidding of SHENGLI NO. 6 drilling platform with 4 months" working period with the main modification of replacing the leg."
通过对广州地铁一号线矩形人工挖孔桩单一墙与其它几种围护结构的经济对比,可以看出该结构具有明显的经济优势。
Through economic comparison of several structural types which were applied in Guangzhou Metro Line 1, the single wall structure formed by rectangular man-dug pile has obvious economic advantage.
胜利油区五号桩油田桩74块为低渗透油田。
Zhuang block 74 in Wuhaozhuang oilfield in Shengli petroliferous area is a low- permeability one.
胜利油区五号桩油田桩74块为低渗透油田。
Zhuang block 74 in Wuhaozhuang oilfield in Shengli petroliferous area is a low- permeability one.