沿着道路前进方向,起点处的桩号是k0.000,每隔一定距离(如100米)做1桩号标记,并在相应有需要的地方进行标记,但应以设计图纸上标明的为准。
施工准备应充分,施工路段桩号位置找准确。放样应精确,误差在规定范围内。
Construction should be fully prepared, the construction section of the pile position to find accurate. Lofting should be accurate, the error in the specified range.
在公路的施工中,为了准确地控制施工标高,必须对加密桩号的施工标高进行计算。
In the highway construction, it must be to compute the construction elevation of the encrypted stake Numbers for exactly controlling the construction elevation.
南岸连接段地基土主要由黄土组成,在桩号1+200以南存在一层软塑状土,强度低,是影响渠坡稳定的关键性土层。
The foundation soil in connection section on southern bank is mainly composed of loess. At the south of section marked 1+200, there is …