施工期间,建筑商如果不必要地砍伐树木可能面临7500美元罚款。
During construction, builders were threatened with $7,500 fines for felling trees unnecessarily.
为了充分利用我们的注意力和精力,我们还需要接受停工期,或者像纽波特建议的那样——“变得懒惰”。
In order to make the most of our focus and energy, we also need to embrace downtime, or as Newport suggests, "be lazy".
哈佛医学院精神病学助理教授斯里尼·皮莱认为,停工期与生产力之间这种反常理的联系可能是由我们大脑的运作方式造成的。
Srini Pillay, an assistant professor of psychiatry at Harvard Medical School, believes this counter-intuitive link between downtime and productivity may be due to the way our brains operate.
工程师的过早去世推迟了工程的完工期。
The untimely death of the engineer delayed the completion of the project.
工期目标:总工期30工作日。
对施工期间引起的不便表示歉意。
We apologize for any inconvenience caused during this works.
它在施工精度上实现了改进,并缩短了施工工期。
It has realized improvement in construction accuracy, and shortened the construction period.
费用本身也可能是产品的其它要素,包括产品工期,资源环境等。
Cost itself may be a product of other factors, including the project duration, resources, and environment.
此行为属于例外,仅会在网络或应用程序停工期间出现。
This behavior is the exception, and would usually occur only during a network or application outage. The CF structure size required to hold only the PTR messages would be
如果全速建设,迪拜1号的整个工期预计将为7到10年。
If and when construction begins in earnest, 1 Dubai will take somewhere between seven and 10 years to complete.
斯特恩说,这些公司不会为了降低成本或者赶工期而走捷径。
Alan Stern says the companies are not cutting corners to keep costs down or to meet tight deadlines.
起初签约的那个人生病了,而九月底工期的最后时限即将到来。
The man originally contracted had fallen ill, and the deadline for the installation, the end of September, was fast approaching.
她当时申请的两个月挖掘工期,变成了三个月,现在又成了五年。
The two months of excavation she had requested had turned into three months, and three months had become five years.
施工人员在施工期间如何处理这些构件的问题上常存在着一些误解。
There exist some misunderstandings in dealing with these suspended components during the construction period.
为了确保大堤安全,必须开展顶管施工期间和工后的长江大堤安全监测。
In order to ensure the safety of the Yangtze levee, safety monitoring during pipe jacking and afterwards is necessary.
小浪底工程安全监测自动化系统规模大,在施工期就开始进行系统建设。
Safety monitoring automation system in Xiaolangdi Project, built since dam construction period, is a larger scale one.
迪斯尼希望能在2015年底盛大开业,这是一个需要付出极大努力才能完成的工期。
Disney hopes to have the complex open by the end of 2015, an ambitious time line.
轨道交通工程在施工期和运营期对城市生态环境都会产生不同程度的影响。
Urban ecological environment will be influenced by the construction of track traffic at varying degree during construction period and operation period.
工程项目实施过程中通常强调三大控制:质量控制、工期控制、成本控制。
Three controls were usually emphasized in the engineering project implementation process: quality control, progress control and cost control.
使该井在施工期间,井壁稳定、起下钻井眼畅通,全井事故、复杂时效均为零。
Thus, stable hole, smooth drilling and tripping operations and zero outage time have been obtained in the construction period.
他们不想使用上面任何一个策略来缓和此点,而简单地接受一些停工期是开发成本的一部分。
They do not attempt to use any of the above strategies to mitigate this and simply accept that some downtime is part of the cost of development.
在Rational的支持下,可以在没有破坏架构或工期的情况下完全向Linux转换。
With Rational support, they can make a fuller transition to Linux without scrapping infrastructure or experiencing downtime.
度假村施工期间,工人于工地发现了一些壶罐和其他手工艺品,接着发现一个古老社群的遗址。
During construction, workers discovered POTS and other artifacts on the site. This led to the discovery of the remains of an ancient community.
另外,修改一个已分配资源的在此任务上的工作时间百分比,也会影响到任务的工期。
In addition to the number of assigned resources, the scheduling of effort-driven tasks is affected by the percentage of a resource's time that is allocated to that task.
现在,可以理解的是,这些产品中有很多在工程制造限制,成本和短暂的工期驱使下没有被很好地设计。
Now, understandably many of these products are not so much Designed as driven by engineering requirements, cost, and short timelines.
如果修复一个已查明的冷却部分的问题需要一个月,那么每个修复周期将推迟整个工期三个月。
If it took, say, a month to fix any problems identified as a section cooled, each cycle would postpone the start date by three months.
方案修改导致新场馆工期延迟,原定于2019年举行的橄榄球世界杯不能如期在新场馆举行。
The delay caused by that revision meant the new stadium won't be ready for the 2019 Rugby World Cup as promised initially.
方案修改导致新场馆工期延迟,原定于2019年举行的橄榄球世界杯不能如期在新场馆举行。
The delay caused by that revision meant the new stadium won't be ready for the 2019 Rugby World Cup as promised initially.
应用推荐