• Three problems on the depression test of Yantan outlet are discussed.

    本文结合岩滩泄水底孔减压试验,讨论了三个问题

    youdao

  • The Yantan Hydropower Station firstly adopted the vertical ship elevator with steel cable winding.

    岩滩水电站是国内首次采用钢丝绳扬提升、部分平衡、厢下水式垂直升船机。

    youdao

  • Measured data show, that plastic pads not only satisfy reliable operation of machine in Yantan hydroelectric station, but also have definite potential.

    测试数据说明塑料不仅能满足岩滩电机可靠运行而且还有一定潜力

    youdao

  • Model acceptance test is applied to accept Yantan turbine performances. The model efficiency maximum is 92 percent in the completion of similar prototype.

    岩滩水电站水轮机性能采用模型验收试验方式验收。其全模拟模型最高效率达到92%。

    youdao

  • This paper introduced construction technique of the inverted vertical line survey system, boring, hole slope measuring, slope correcting, etc. of the Yantan hydropower station.

    介绍岩滩水电站大坝垂线观测系统倒垂线钻孔的孔控制、孔斜测量、孔斜纠偏施工技术及廊道内遇长岩芯的处理方法。

    youdao

  • This paper introduced construction technique of the inverted vertical line survey system, boring, hole slope measuring, slope correcting, etc. of the Yantan hydropower station.

    介绍岩滩水电站大坝垂线观测系统倒垂线钻孔的孔控制、孔斜测量、孔斜纠偏施工技术及廊道内遇长岩芯的处理方法。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定