Yantan project 岩滩工程
Yantan vertical shiplift 岩滩垂直升船机
Yantan Hydropower Company 岩滩发电公司
Three problems on the depression test of Yantan outlet are discussed.
本文结合岩滩泄水底孔减压试验,讨论了三个问题。
The Yantan Hydropower Station firstly adopted the vertical ship elevator with steel cable winding.
岩滩水电站是国内首次采用钢丝绳卷扬提升、部分平衡、船厢下水式垂直升船机。
Model acceptance test is applied to accept Yantan turbine performances. The model efficiency maximum is 92 percent in the completion of similar prototype.
岩滩水电站水轮机性能采用模型验收试验方式验收。其全模拟模型最高效率达到92%。
应用推荐