It is pointed out that the rainstorm center is under the wind shear, above which convergence center and the maximum positive vorticity exist.
指出暴雨中心位于风速切变的下方,同时上空也伴随辐合中心,以及正涡度极大值。
After a period of service time, the moment rigidity of the stiffening beam for a suspended bridge will be impaired under the wind load, which will lead to the structural damage.
悬索桥服役一段时间以后,在风荷载的作用下将造成主要构件加劲梁抗弯刚度的削弱进而导致结构损伤。
Therefore, we should do research on the time-dependent reliability of cable-suspended pipelines (CSP) under the wind load with comprehensive consideration of strength and fatigue.
因此,综合考虑强度和疲劳问题,研究悬索跨越管道结构在风荷载作用下的时变可靠性对结构的正常使用具有重要意义。
Therefore, we should do research on the time-dependent reliability of cable-suspended pipelines (CSP) under the wind load with comprehensive consideration of strength and fatigue.
因此,综合考虑强度和疲劳问题,研究悬索跨越管道结构在风荷载作用下的时变可靠性对结构的正常使用具有重要意义。
应用推荐