Using MQ to get risky operations off the critical path.
使用MQ以从关键路径去除风险大的操作。
As this title suggests, these features determine the critical path.
如此题目所暗示的,这些特性确定了关键的路径。
If not, determine the critical path and look for ways to accelerate these activities to get you back on track.
若否,找出关键路径,并寻找到加速执行相关工作的办法以便能让你重回正轨。
If an activity on the critical path is a week late, you can't sit idly and allow the entire project to be a week late.
如果处在关键路径上的某个活动延期了一周,你可不能傻坐着眼看整个项目延期一周。
Profiler results help you identify the critical path of your application; that is, the code that is executed most of the time.
分析器结果可以帮助标识应用程序的关键路径;即大部分时间所执行的代码。
The improved lifting scheme is adopted to reduce the critical path delay.
采用改进的提升算法,减少了关键路径上的延时。
S method, which was created by Kato Shokichi (Japan), the event on the critical path should be done first.
通常流行的日本加藤昭吉的K·S法,主张关键工序先进行。
This paper introduces a new method of determining the critical path of the network chart-node slack method.
介绍了一种确定网络图关键线路的新方法——结点时差法。
Education and training is the critical path to enhance the value of human capital and overall quality of migrant workers.
教育培训是提升农民工人力资本价值、综合素质的关键途径。
To verify deadlines of activity instances within workflow, a method of dynamic verification was proposed based on the critical path.
为了动态验证工作流中活动实例的截止期限,提出了一种基于关键路径进行动态验证的方法。
The multiplier in this paper is Bit-serial mode and the new hardware architecture is regular which reduces the delay of the critical path.
新的乘法器采用比特串行方式,使得硬件结构更加规则,减少了原有乘法器关键路径的延迟。
Draw a CPM diagram for the Dreamcast Project. Based on the qualitative information in the case, what do you think will be the critical path?
依据案例中的定性信息,画出梦想演出项目的CPM图表,你认为哪条是关键路径?
For example, you can clearly see the critical path for tasks people are working on if you filter for in-progress tasks and group by critical.
例如,如果对进行中的任务进行筛选并按“关键任务”进行分组,可以清楚地查看工作人员所处理的任务的关键路径。
Note that without resource considerations, the length of time through the critical path is nine days (longest time through the various sequential steps).
注意到如果不考虑资源,通过关键路径的时间是9天(通过各种各样顺序排列的步骤所需的最长时间)。
The new method quantifies the time parameters with L-R triangular fuzzy number, and identifies the critical path through ranking method of fuzzy number.
新方法将L-R三角模糊数引入到网络时间参数计算,并且采用模糊数大小排序的方法确定关键线路。
It dispenses those environments into an on-premise cloud, and once they are out and running, the appliance is not a part of the critical path for that application.
它将这些环境分配到一个预置云中,并且一旦环境启动并运行,那么该设备将不再成为应用程序的关键部分。
This paper put forward a simplified method that can be used on activity on node network and activity on line network to identify the critical path of schedule.
提出了一种简化的确定关键路径方法,该方法可分别运用于单代号和双代号网络图中。
Through the synthesis of MAC circuit, it validates that the ideas and methods presented in the paper do well to reduce the critical path delay and circuit gates.
电路综合实验表明采用本文所提出思想和方法可以有效减少MAC关键路径时延和电路门数。
On the other hand, the critical path to business success is not the technology itself, but changing the business process and the work supported by the technology.
另一方面,商业成功的关键要素并不是技术本身,而是改变技术所支持的业务流程和工作。
In this case, what we have been able to do is provide a solution environment where you can actually define, visualize and understand the critical path across projects.
在这种情况下,我们已经能够做的是提供一个解决方案环境,你们可以在其中实际定义、可视化和了解项目之间的关键路径。
After enough turns of simulation, the distribution of the total work period can be determined, at the same time the critical path can be found in the probability concept.
对大量仿真计算结果进行统计分析,可以得到总工期及关键路线的概率分布结果,为施工管理提供更多的信息。
The introduction of the critical path concept in the key steps of body donation, such as registration, consulting and training staff, could better the services of body donation.
在遗体捐献工作中引进关键路径理念,在认捐登记、接受咨询、实施捐献以及对工作人员的培训等多个环节中应用,从而可以更好地为遗体捐献工作服务。
At the same time, compute all the path criticalities by utilizing the relationship between the critical path of interval networks and the path criticality of the fuzzy network as well.
同时利用截集区间网络关键路径与模糊网络关键度的关系,计算出所有路径的关键度。
Based on the study of calculating approaches of fuzzy network, this paper puts forward a new method to calculate the parameters and determine the critical path of fuzzy network planning.
基于对模糊网络计算方法的研究,提出了新的网络参数计算和关键线路判断方法。
Finally, an engineering project application case is analyzed to illustrate the whole process of Earned Value management based on the reward and penalty system of time and the critical path.
最后,本文通过一个工程项目案例具体演示基于工期奖罚制度与关键路径的挣值管理的使用过程。
A new combinational fault simulator, PARCRIPT, which combines the merits of the concept of the parallel fault simulation and the efficiency of the critical path tracing (CRIPT), is presented.
本论文提出一快速的组合电路错误模拟器,此错误模拟器结合了并行错误模拟与临界路径追纵方法的优点。
Secondly, the issue logic is not only the critical path in a superscalar microprocessor, but also critical to the performance of a multithreaded microprocessor with superscalar execution core.
其次,指令发射逻辑是超标量处理器中的关键路径,也是制约执行单元为超标量结构的多线程处理器主频提高的关键因素。
This article describes the common coal supply chain model, summarizes the status of coal and coal transportation routes logistics node status, identified the critical path and coal logistics nodes.
本文描述了电煤供应链的常用模式,总结了煤炭运输通道现状和煤炭物流结点的现状,找出了煤炭物流的关键路径和结点。
The critical path controlling the first power generation of Sanbanxi Hydropower Station is the construction of the diversion tunnel and dam as well as the initial filling of the reservoir.
三板溪工程导流洞与大坝施工以及水库初期蓄水是控制首台机组发电工期的关键线路。
The critical path controlling the first power generation of Sanbanxi Hydropower Station is the construction of the diversion tunnel and dam as well as the initial filling of the reservoir.
三板溪工程导流洞与大坝施工以及水库初期蓄水是控制首台机组发电工期的关键线路。