D. Start work on only the critical path activities.
只开始关键路径上的活动。
This places the "orange" resource on the critical path.
这就在关键路径上放置了一个“桔红色”资源。
Using MQ to get risky operations off the critical path.
使用MQ以从关键路径去除风险大的操作。
As this title suggests, these features determine the critical path.
如此题目所暗示的,这些特性确定了关键的路径。
Show the critical path for your project to quickly find problem tasks.
显示项目的关键路径:以快速查找有问题的任务。
The improved lifting scheme is adopted to reduce the critical path delay.
采用改进的提升算法,减少了关键路径上的延时。
This method of analysis is commonly known as the Critical Path method (CPM).
该分析方法通常被称为关键路线法(Critical Path Method (CPM))。
Always be focused on the critical path to quality, from raw ingredients to the cup.
你关注的重点永远是品质——从原料到酒杯选择,一丝都不可马虎。
We allow an additional time buffer associated with the critical path, and not the other tasks.
我们允许一个在关键路径上添加附加时间来进行缓冲,但并不是在某一任务中添加时间。
S method, which was created by Kato Shokichi (Japan), the event on the critical path should be done first.
通常流行的日本加藤昭吉的K·S法,主张关键工序先进行。
This paper introduces a new method of determining the critical path of the network chart-node slack method.
介绍了一种确定网络图关键线路的新方法——结点时差法。
If not, determine the critical path and look for ways to accelerate these activities to get you back on track.
若否,找出关键路径,并寻找到加速执行相关工作的办法以便能让你重回正轨。
If an activity on the critical path is a week late, you can't sit idly and allow the entire project to be a week late.
如果处在关键路径上的某个活动延期了一周,你可不能傻坐着眼看整个项目延期一周。
Profiler results help you identify the critical path of your application; that is, the code that is executed most of the time.
分析器结果可以帮助标识应用程序的关键路径;即大部分时间所执行的代码。
Education and training is the critical path to enhance the value of human capital and overall quality of migrant workers.
教育培训是提升农民工人力资本价值、综合素质的关键途径。
To verify deadlines of activity instances within workflow, a method of dynamic verification was proposed based on the critical path.
为了动态验证工作流中活动实例的截止期限,提出了一种基于关键路径进行动态验证的方法。
You will review each of the activities on the critical path and identify the potential risks that could put your schedule in jeopardy.
你会检查关键路径上的每一格活动,并识别可能破坏进度的风险。
The multiplier in this paper is Bit-serial mode and the new hardware architecture is regular which reduces the delay of the critical path.
新的乘法器采用比特串行方式,使得硬件结构更加规则,减少了原有乘法器关键路径的延迟。
After studying conditions for generating PODCM in the critical path of data flow graph (DFG), an algorithm was introduced to produce PODCM.
通过分析在数据流图(DFG)关键路径上生成PODCM的条件,给出了在DF G关键路径上生成PODCM的算法并建立了PODCM库。
For example, you can clearly see the critical path for tasks people are working on if you filter for in-progress tasks and group by critical.
例如,如果对进行中的任务进行筛选并按“关键任务”进行分组,可以清楚地查看工作人员所处理的任务的关键路径。
Note that without resource considerations, the length of time through the critical path is nine days (longest time through the various sequential steps).
注意到如果不考虑资源,通过关键路径的时间是9天(通过各种各样顺序排列的步骤所需的最长时间)。
The new method quantifies the time parameters with L-R triangular fuzzy number, and identifies the critical path through ranking method of fuzzy number.
新方法将L-R三角模糊数引入到网络时间参数计算,并且采用模糊数大小排序的方法确定关键线路。
It dispenses those environments into an on-premise cloud, and once they are out and running, the appliance is not a part of the critical path for that application.
它将这些环境分配到一个预置云中,并且一旦环境启动并运行,那么该设备将不再成为应用程序的关键部分。
Total lead time for an end item, calculated by taking the individual lead times for all items on the critical path through all levels of the bill of material.
最终产品的总共前置时间,以物料清单各层要径所有产品前置时间计算得出。
This paper put forward a simplified method that can be used on activity on node network and activity on line network to identify the critical path of schedule.
提出了一种简化的确定关键路径方法,该方法可分别运用于单代号和双代号网络图中。
Although I have reduced the risk of bottlenecks and provided some additional lead time to the critical path, I haven't added any time to the overall project plan.
虽然我已经降低瓶径的风险并在关键路径上提供了一些额外的时间,但是我在整个项目计划中没有增加时间。
Through the synthesis of MAC circuit, it validates that the ideas and methods presented in the paper do well to reduce the critical path delay and circuit gates.
电路综合实验表明采用本文所提出思想和方法可以有效减少MAC关键路径时延和电路门数。
Through the synthesis of MAC circuit, it validates that the ideas and methods presented in the paper do well to reduce the critical path delay and circuit gates.
电路综合实验表明采用本文所提出思想和方法可以有效减少MAC关键路径时延和电路门数。
应用推荐