• Water release structure of Maopingxi brook is one of TGPs important projects.

    茅坪溪泄建筑物三峡工程重要施工项目之一。

    youdao

  • After 1998 flood, people are concerned about the influence of TGPs flood control regulation on the sedimentation in the reservoir.

    1998年洪水人们关心三峡工程防洪作用以及防洪调度库区泥沙淤积影响

    youdao

  • This paper introduces the in situ model test results on the technology for the TGPs soil rock cofferdam compacted by underwater blasting.

    介绍三峡工程原位开展高土石围堰水下爆炸压实技术研究模型试验情况。

    youdao

  • This paper introduces the research results on numerical stress strain analysis and centrifuge model test for the TGPs high soil rock cofferdam.

    介绍了应用数值分析离心模型试验方法对三峡深水高土石围堰进行应力变形研究成果

    youdao

  • The TGPs third stage river closure is a key works for the early stage cofferdam supported power generation and guarantee of the successive construction of hydroelectric plant and dam at right bank.

    三峡工程第三截流工程确保实现初期围堰挡水发电同时修建右岸大坝电厂关键性工程。

    youdao

  • The TGPs third stage river closure is a key works for the early stage cofferdam supported power generation and guarantee of the successive construction of hydroelectric plant and dam at right bank.

    三峡工程第三截流工程确保实现初期围堰挡水发电同时修建右岸大坝电厂关键性工程。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定