The suggested discharge for 3rd-stage river closure of TGP is 12200 m3/s ,and the final water drop is 5.77 m,thus,the closure work will be the largest o ne of comprehensive difficulties in the world.
三峡工程三期截流,流量为12200m3/s,落差为5.77m,此截流工程将是目前世界上综合难度最大的截流工程。
参考来源 - 对三峡工程三期截流的几点认识 Some recognitions on TGP's 3rd·2,447,543篇论文数据,部分数据来源于NoteExpress
Water release structure of Maopingxi brook is one of TGPs important projects.
茅坪溪泄水建筑物是三峡工程的重要施工项目之一。
After 1998 flood, people are concerned about the influence of TGPs flood control regulation on the sedimentation in the reservoir.
1998年洪水后,人们关心三峡工程的防洪作用以及防洪调度对库区泥沙淤积的影响。
This paper introduces the in situ model test results on the technology for the TGPs soil rock cofferdam compacted by underwater blasting.
介绍了在三峡工程原位开展高土石围堰水下爆炸压实技术研究的模型试验情况。