At the end of Elaboration you want to drive down as much technical risk as possible and deliver a stable architecture.
在精化阶段的最后,您希望尽可能的降低技术风险,并且提供一个稳定的体系结构。
Since ASDI had agreed that an OODB wouldn't be prudent for this project, we no longer had that technical risk to manage.
因为ASDI同意对于这个项目OODB 是不合适的,我们因此不再有技术上的风险要管理。
As you will see in Part 2 of this series, RUP's Elaboration phase focuses on addressing technical risk early in the lifecycle.
如您将在本系列第2部分中见到的,RUP的细化阶段着重于在生命周期早期解决技术风险。
For example, at the end of Elaboration you want to drive as much technical risk as possible and deliver a stable architecture.
举例来说,在Elaboration的末尾,您希望去除尽可能多的技术风险,并且交付稳定的架构。
You'll see how technical risk is addressed during the Elaboration phase by developing an end-to-end working skeleton of the system.
您将会看到,通过开发端到端的系统工作框架,在细化阶段如何处理技术风险。
In this paper, the connotation, objective, contents, assessment, mechanism and treatment of technical risk are discussed.
对技术风险的内涵、技术风险分析的对象和内容、技术风险评价、技术风险机制与处理进行了讨论。
How to manage the technical risk including developing process risk and product risk is discussed. Finally a case study is given.
本文从技术风险管理的过程入手,探讨了如何进行风险的识别、分析和控制,并给出了一个应用实例。
At last the usability of this method to evaluate the technical risk of equipment development is demonstrated through experiments.
最后,结合实例验证说明了该模型对研制方案技术风险评估的可用性。
The management of technical risk involves the prioritization of each risk, and the identification of an appropriate risk mitigation strategy.
技术风险的管理包括制定每一个风险的优先次序,以及确定一个恰当的风险缓解策略。
This approach reduces both your business and technical risk, while delivering a high-quality solution that meets the changing needs of its end users.
该方法减少了商业和技术风险,而交付满足最终用户变化需求的高质量解决方案。
This presentation addresses specific areas of technical risk for offshore wind turbine projects, and related strategies for mitigating these risks.
该演讲将阐述海上风机项目的技术风险的具体方面,以及降低这些风险的策略。
Coordinate activities with sales, engineering, and customers to ensure project success and appropriately manage technical risk and customer issues.
协调销售部、项目实施部和客户等方面的关系,确保项目顺利开展,适度管理技术风险和客户问题;
The financial risks of futures brokerage firms involve management risk, operation risk, capital risk and technical risk with a focus on capital risk.
期货经纪公司的财务风险主要表现在其管理风险、经营风险、资金风险和技术风险上,其中最重要的是资金风险。
This decision potentially increases development and operational costs, not to mention overall technical risk, in order to streamline a relatively straightforward administration effort.
为了将相对直截了当的管理工作流水化,此决定潜在地增加了开发和操作成本,更不要提整体的技术风险。
To determine which use cases represent technical risk, we need to understand both the general gist of the individual use cases, which is why we initially documented the use cases in point form.
为了确定哪个用例表现出技术风险,我们需要了解单个用例的一般要点,这就是为什么我们最初在要点表中描述用例。
Technical risk: The project requires porting an existing application to run on top of IBM WebSphere application Server.
技术风险:项目需要将一个已存在的应用移植到IBMWebSphereApplicationServer上运行。
Technical risk: The project requires porting an existing application to run on top of IBM WebSphere application Server.
技术风险:项目需要将一个已存在的应用移植到IBMWebSphereApplicationServer上运行。
应用推荐