RUP's Elaboration phase is directed at managing technical risk.
RUP的精化阶段是对准技术风险的管理的。
Three to focus on grasping the key points, difficulties, strict control of technical risk.
三要突出抓重点、难点环节,严控技改现场风险。
The factors cause to project period alteration include invest cycle change and technical risk etc. mainly.
导致折现期变动的因素主要包括投资周期变动和技术风险等。
At the end of Elaboration you want to drive down as much technical risk as possible and deliver a stable architecture.
在精化阶段的最后,您希望尽可能的降低技术风险,并且提供一个稳定的体系结构。
Technical risk: The project requires porting an existing application to run on top of IBM WebSphere application Server.
技术风险:项目需要将一个已存在的应用移植到IBMWebSphereApplicationServer上运行。
Since ASDI had agreed that an OODB wouldn't be prudent for this project, we no longer had that technical risk to manage.
因为ASDI同意对于这个项目OODB 是不合适的,我们因此不再有技术上的风险要管理。
Melissa Finucane: And why that might not be consistent with the recommendations that come out of technical risk assessments.
梅丽莎·芬努凯恩:这也可以解释为什么人们不采取技术风险评估后的推荐方法。
As you will see in Part 2 of this series, RUP's Elaboration phase focuses on addressing technical risk early in the lifecycle.
如您将在本系列第2部分中见到的,RUP的细化阶段着重于在生命周期早期解决技术风险。
In this paper, the connotation, objective, contents, assessment, mechanism and treatment of technical risk are discussed.
对技术风险的内涵、技术风险分析的对象和内容、技术风险评价、技术风险机制与处理进行了讨论。
For example, at the end of Elaboration you want to drive as much technical risk as possible and deliver a stable architecture.
举例来说,在Elaboration的末尾,您希望去除尽可能多的技术风险,并且交付稳定的架构。
You'll see how technical risk is addressed during the Elaboration phase by developing an end-to-end working skeleton of the system.
您将会看到,通过开发端到端的系统工作框架,在细化阶段如何处理技术风险。
How to manage the technical risk including developing process risk and product risk is discussed. Finally a case study is given.
本文从技术风险管理的过程入手,探讨了如何进行风险的识别、分析和控制,并给出了一个应用实例。
At last the usability of this method to evaluate the technical risk of equipment development is demonstrated through experiments.
最后,结合实例验证说明了该模型对研制方案技术风险评估的可用性。
Along with the large centralized data on the achievement of enterprise-class data center technical risk is relatively concentrated.
随同着数据大集中的实现,企业级数据中央的技术风险也相对集中。
The management of technical risk involves the prioritization of each risk, and the identification of an appropriate risk mitigation strategy.
技术风险的管理包括制定每一个风险的优先次序,以及确定一个恰当的风险缓解策略。
This approach reduces both your business and technical risk, while delivering a high-quality solution that meets the changing needs of its end users.
该方法减少了商业和技术风险,而交付满足最终用户变化需求的高质量解决方案。
This presentation addresses specific areas of technical risk for offshore wind turbine projects, and related strategies for mitigating these risks.
该演讲将阐述海上风机项目的技术风险的具体方面,以及降低这些风险的策略。
Coordinate activities with sales, engineering, and customers to ensure project success and appropriately manage technical risk and customer issues.
协调销售部、项目实施部和客户等方面的关系,确保项目顺利开展,适度管理技术风险和客户问题;
The financial risks of futures brokerage firms involve management risk, operation risk, capital risk and technical risk with a focus on capital risk.
期货经纪公司的财务风险主要表现在其管理风险、经营风险、资金风险和技术风险上,其中最重要的是资金风险。
In this case, the forecasted business benefit or other factors driving change are usually significant enough that a lower level of technical risk is mandated.
在这种情况下,预计的业务利益或其他因素驱动的改变往往变得非常重要,以降低技术风险。
This article has discussed the risky society and the advance in technology relations from the risk society's Angle of view, and make the reply how to dispel the technical risk.
文章从风险社会的视角探讨了风险社会与科技进步的关系,并对如何消解科技风险做出了回答。
This decision potentially increases development and operational costs, not to mention overall technical risk, in order to streamline a relatively straightforward administration effort.
为了将相对直截了当的管理工作流水化,此决定潜在地增加了开发和操作成本,更不要提整体的技术风险。
Finally, puts forward attention notes to control cost through subdivision of technical risk of construction projects, and provides the reference to construction project cost control.
最后提出基于建筑工程风险细分进行项目成本控制应用的注意点,为建筑工程项目成本控制提供参考。
To determine which use cases represent technical risk, we need to understand both the general gist of the individual use cases, which is why we initially documented the use cases in point form.
为了确定哪个用例表现出技术风险,我们需要了解单个用例的一般要点,这就是为什么我们最初在要点表中描述用例。
Tailor your technical choices to the local skill pool to minimize hiring risk and lastly, and most importantly, have fun and be sure that being in startup is what you want.
以本地的技能标准来定制你的技术选择,来最小化雇佣的风险和持久性,最重要的是,享受乐趣同时确定这是你心里所想要创办的企业。
Build a risk management plan that includes plans for dealing with risks related to technical issues, schedule, and cost.
应构建风险管理计划,包括处理与技术问题、日程表和成本相关风险的计划。
You must address the major technical, business, and programmatic risks as early as possible, rather than postponing risk resolution toward the end of the project.
你必须尽可能早地指出主要技术,业务和编程风险,而不是把风险的解决推迟到项目的最后。
However, the RUP does not provide sufficient coverage for Technical Solution process area needed for risk, compliance and governance processes.
然而,RUP没有完全覆盖风险、法规遵循和治理过程所需的技术解决方案过程域。
Identify or define a suitable project to implement a first solution, either a technical pilot, a business pilot, or perhaps a real business project with an acceptable risk profile.
指定或定义合适的项目来实现第一个解决方案,这既可以是技术试验、业务试验,也可以是存在可接受风险的真实业务项目。
Identify or define a suitable project to implement a first solution, either a technical pilot, a business pilot, or perhaps a real business project with an acceptable risk profile.
指定或定义合适的项目来实现第一个解决方案,这既可以是技术试验、业务试验,也可以是存在可接受风险的真实业务项目。
应用推荐