• The mould manufacture scheduling based on due date is a problem of how to schedule operation processing sequence to minimize tardiness.

    基于交货期的模具车间作业调度问题是解决不同类型工件的加工排序,使其误工最少。

    youdao

  • The queue sorting algorithms include load adjustment and sequence number scheduling.

    确定队列顺序的负载调整、队列号等算法等。

    youdao

  • Job-Shop scheduling problem, as the core of manufacturing business, is a class of time constraints, sequence constraints, and resource constraints of the combinatorial optimization problem.

    车间调度的优化问题,作为制造企业的核心,是一类具有时间约束、次序约束以及资源约束的组合优化问题。

    youdao

  • This scheduling algorithm can control the execution sequence of subtasks and reduce control input output delay.

    该算法能够控制子任务执行顺序和降低控制输入输出延迟。

    youdao

  • Responsibility Assignment Matrix is firstly used to simplify the scheduling problem, and then the combination of two sequence regulations is to solve the problem.

    先利用指派分配矩阵算法简化排序问题,再采用两种排序规则相结合的方法进行项目排序。

    youdao

  • The Job shop scheduling problem is a combinatorial optimum problem that is constrained with time, sequence and resource.

    车间作业调度问题是一类具有时间约束、次序约束和资源约束的组合优化问题。

    youdao

  • The practice of scheduling similar programs in sequence to promote audience flow.

    是将类似节目编排在一起的做法。旨在提高受众流动。

    youdao

  • The practice of scheduling similar programs in sequence to promote audience flow.

    是将类似节目编排在一起的做法。旨在提高受众流动。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定