... sequence relay ==> 顺序动作继电器 sequence scheduling ==> 时序信号 sequence signal ==> 顺序信号 ...
基于14个网页-相关网页
scheduling sequence 调度序列
The mould manufacture scheduling based on due date is a problem of how to schedule operation processing sequence to minimize tardiness.
基于交货期的模具车间作业调度问题是解决不同类型工件的加工排序,使其误工最少。
The queue sorting algorithms include load adjustment and sequence number scheduling.
确定队列顺序的负载调整、队列号等算法等。
Job-Shop scheduling problem, as the core of manufacturing business, is a class of time constraints, sequence constraints, and resource constraints of the combinatorial optimization problem.
车间调度的优化问题,作为制造企业的核心,是一类具有时间约束、次序约束以及资源约束的组合优化问题。
应用推荐