• Through implementing this plan, we not only ensure the quality of highway, but also improve the schedule of construction.

    通过实施方案保证公路质量提高施工进度

    youdao

  • The Augustine panel questioned the cost, design and construction schedule of the rocket in a report submitted to the White House for consideration.

    斯汀专项研究小组质疑提交给白宫考虑报告中的成本设计以及建设计划

    youdao

  • Figure 10: Sample master schedule that has the overall Construction phase divided into three six-week periods, with important delivery dates at the end of each iteration.

    10每个迭代最后重要交付日期整个构建阶段分成三个六周周期的综合时间表进行采样

    youdao

  • Supervise, co-ordinate and schedule the activities of workers who operate cranes and construction, paving, drilling, railway maintenance and other similar heavy equipment.

    监督协调和统筹安排操作起重机施工摊铺钻井铁路维护其他类似重型设备工人活动

    youdao

  • Other work must be centered on the construction schedule to adapt to the requirements of the arrangements.

    施工中的其他工作必须围绕着并适应施工进度计划要求安排。

    youdao

  • In this paper author introduces the application of this article in road bidding, construction management, engineering schedule, engineering quality, engineering cost and contract management.

    着重论述条款公路投标施工组织工程进度、工程质量、工程费用、合同管理各个阶段中的应用

    youdao

  • We should work according to the overall schedule chart (the construction time schedule) of the project.

    我们应该根据工程项目标进度表(构筑进度表)工作

    youdao

  • Construction diversion is important component of comprehensive design in water conservancy projects and has direct relationship with the whole engineering schedule and cost.

    施工导流水利枢纽工程总体设计重要组成部分直接关系工程总进度工程造价

    youdao

  • In the construction of highway, the construction organization of through cut and the construction quality will influence the construction schedule and slope stability.

    公路建设路堑开挖施工组织是否合理、施工质量如何,影响施工进度边坡稳定

    youdao

  • In the practical application of power transmission lines to solve the river sealed route, schedule, safety, environmental damage relationships, reducing construction costs.

    输电线路工程实际运用解决河流封航进度安全环境破坏关系降低了施工费用。

    youdao

  • Composition, installation procedure and features, construction schedule and quality control and inspection of sulphur-burning sulphuric acid plants are reviewed.

    介绍了硫磺装置组成安装工艺特点施工进度计划质量控制检查

    youdao

  • Standard brick upon the occurrence of these problems, construction will be disrupted, serious impact on the building construction schedule and project quality.

    一旦发生这些问题施工打乱严重影响建筑物施工进度工程质量

    youdao

  • Handle a whole team of engineering and the whole design and construction process; ensure new project complies with requirements of quality products, safety, cost and schedule.

    管理整个工程团队、相关设计施工过程控制;确保项目质量安全费用进度要求完成。

    youdao

  • With practical projects, authors introduce the construction method and principle, schedule, plan and technical points of the lifting construction of steel pipe arch truss segments.

    通过工程实例介绍钢管桁架节段吊装施工方法原理施工程序、施工布置技术要点等。

    youdao

  • Selecting and applying of the scaffoldings influences directly on the safety of construction, and at the same time it will also affect the work quality, construction schedule and company' s benefit.

    脚手架选择使用直接影响施工作业安全关系工程质量、施工进度公司经济效益的提高。

    youdao

  • This paper probes into the countermeasures for doing well the construction management from aspects of the schedule control, cost control, and quality control, etc.

    工程进度控制成本控制、质量控制方面探讨搞好施工管理对策

    youdao

  • In the control of construction schedule for hydropower projects, risk analysis of the schedule is a key.

    工程施工进度风险分析计算施工进度控制中的重要环节

    youdao

  • The project completion probability is discussed, which fully describes the uncertainty of construction sequence schedule and provides basis for analysis of time limit.

    进行完工概率分析,较好地描述了施工进度计划不确定性施工工期论证分析提供了依据

    youdao

  • With a combination of construction and operation stages in project life cycle, gas filling station project schedule was studied, and a fuzzy dependent-chance programming model was established.

    项目寿命周期影响现金流建设阶段运营阶段结合起来研究加气站项目进度问题,构建了项目进度问题的模糊相关机会规划模型

    youdao

  • The functions and characters of the software P3 and its application to work out the construction schedule of a pumped storage power station are described.

    介绍P 3软件功能特点以及抽水蓄能电站工程施工进度计划编制中的应用过程及成果。

    youdao

  • During the process from plan to completion, the project team has experienced a series problem center on cost of the building, construction quality, construction schedule and so on.

    项目设计团队笔下理想成为落地实物的过程中,经历围绕项目造价施工质量工期进度一系列问题艰难博弈。

    youdao

  • In roadbed construction, excessive soil is used to fill subgrade because of weather and construction schedule constraints and other reasons.

    公路路基施工中,天气施工工期限制原因,会经常遇到采用过湿填筑路基的情况。

    youdao

  • The principle to constitute the reasonable schedule in quick construction is presented and the application of concurrent construction in water resources and hydropower engineering is researched.

    构想快速施工合理工期制定原则方法并行施工水利水电工程应用一些思路

    youdao

  • Through active promotion of the standard, production and construction requirements on power material procurement are met in quality, quantity and delivery schedule and the procurement cost is lowered.

    通过积极推行标准达到保证电力物资采购质量数量、供贷时间满足生产建设要求,并降低采购成本

    youdao

  • The pace of construction in the run-up to the August 8 2008 opening ceremony was indeed frenetic and with the full might of the state behind it, the programme was completed well ahead of schedule.

    2008年8月8日奥运会开幕式建设速度确实疯狂举国努力之下,工程完工时间比计划大大提前。

    youdao

  • In that case, ensuring the construction term of the construction schedule reasonably and impersonally would be the guarantee of the whole construction procedure.

    如何科学、客观确定施工进度计划中各分部、分项工程持续时间施工进度计划具有合理性和可行性的保证

    youdao

  • How to improve the construction quality of air cooled platform, speed up the air cooled platform construction schedule, will become the important research topic of power plant construction company.

    如何施工提高平台施工质量加快空冷平台施工进度成为电建施工单位一个重要研究课题

    youdao

  • Welding foreman, according to the director's construction period plan, actual completion of construction team, evaluate the ability of completing missions on schedule.

    是指焊接班长根据主任工期计划,对照施工班组手中工作实际完成情况,评估是否能够按期完成任务

    youdao

  • Providing services required because of signIficant changes in the Project, including size, schedule, materials, method of bidding or construction contracting or construction management.

    工程重大变化(包括工程规模进度材料招标方法施工承包或施工管理等)的要求提供的相应服务

    youdao

  • Providing services required because of signIficant changes in the Project, including size, schedule, materials, method of bidding or construction contracting or construction management.

    工程重大变化(包括工程规模进度材料招标方法施工承包或施工管理等)的要求提供的相应服务

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定