Through implementing this plan, we not only ensure the quality of highway, but also improve the schedule of construction.
通过实施该方案,既保证公路质量,又提高施工的进度。
The Augustine panel questioned the cost, design and construction schedule of the rocket in a report submitted to the White House for consideration.
奥古斯汀专项研究小组质疑提交给白宫考虑的报告中的成本、设计以及建设计划。
Figure 10: Sample master schedule that has the overall Construction phase divided into three six-week periods, with important delivery dates at the end of each iteration.
图10:用每个迭代最后的重要的交付日期对整个构建阶段分成三个六周周期的综合时间表进行采样。
应用推荐