• The method is introduced to calculate the stable and instable water level in the foundation pit after disturbed Wells going into work, and it is programmed.

    介绍了干扰井群工作基坑稳定稳定水位降深的计算方法,并编制了相应的计算程序。

    youdao

  • The method is introduced to calculate the stable and instable water level in the foundation pit after disturbed Wells going into work, and it is programmed.

    介绍了干扰井群工作基坑稳定稳定水位降深的计算方法,并编制了相应的计算程序。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定