·2,447,543篇论文数据,部分数据来源于NoteExpress
The method is introduced to calculate the stable and instable water level in the foundation pit after disturbed Wells going into work, and it is programmed.
介绍了干扰井群工作后基坑的稳定和不稳定水位降深的计算方法,并编制了相应的计算程序。
youdao
应用推荐
模块上移
模块下移
不移动