Each level of the building is configured to allow post-construction subdivisions to offer a wide range of office sizes.
建筑每层的构造都允许在建成后进行细分,以提供更多不同面积的办公空间。
Post-construction settlements controlled by empirical settlement rate standards used in some highways can not be obtained.
现有的沉降速率法主要依据地方经验沉降速率标准,无法与获得的工后沉降相联系。
The settlement of soft soil foundation which contains rotten wood is fast in convergence after it is deep treated and has a little post-construction settlement.
含腐木的软土地基在进行深层处理后,沉降发生早、收敛快,工后沉降小;
The new model presents a new method for analysis and prediction of settlement and it is found to be a good reference to post-construction settlement of embankment in loess areas.
新模型为工后沉降的分析预测提供了一种新的方法,可为今后黄土路堤工后沉降的预测计算提供参考。
The most pivotal technical problem of building high-speed railway on soft soil is strictly controlling post-construction settlement of subgrade and its elastic deformation of top surface.
在软土地基上修建高速铁路,其最关键的技术问题就是严格控制路基的工后沉降及列车高速运行时路基顶面的弹性变形。
Abstract: Highway engineering feasibility study report is critical of the preliminary work of road construction and an important basis for project approval and post-construction drawing design.
摘要:公路工程可行性研究报告是公路建设前期工作的关键,是项目立项和后期施工图设计的重要依据。
We will intensify the oversight of the use of materials and funds for disaster relief and post-quake reconstruction and ensure the quality of construction projects.
要加强对抗震救灾和灾后恢复重建资金、物资的监管,确保工程建设质量。
Construction of the blog page can then be achieved by loading the components (blog posts, category list, post history, etc.) from memcached and writing the completed HTML back to the client.
博客页面的构造可通过从memcached加载各个组件(比如blogpost、categorylist、posthistory等)并将完成的HTML写回至客户机实现。
Post tensioned prestressed concrete hollow slab(PTPCHS) is one of high strength prestressed concrete hollow slab, and its construction performance is still unknown yet.
后张预应力混凝土空心板是一种高效预应力空心板,目前国内尚未对其结构性能进行系统研究。
Blocking, toe-nailing, or proprietary fasteners are needed for the girt-to-post connection, which requires more material and labor than flat construction.
块状物,斜钉,专有的紧固件在墙梁-柱子连接中被用到,这比公寓建设需要更多的材料和劳动力。
Through engineering practice and summary, some problems in terms of application of post cast zone for construction were analyzed, and improvement Suggestions were put forward.
通过工程实践总结,对施工后浇带应用方面的一些问题进行了分析,并提出了改进意见。
The use of Sitka Spruce was carried into post-war construction in many aircraft.
云杉使用锡特卡被带进战后建设的许多飞机。
The reinforcement scheme, structure calculation, post tensioning ironware and construction essentials for the parking garage were introduced in this paper.
本文介绍了该停车库的加固方案、结构计算、后张拉铁件和施工要点。
The theory foundation of this thesis is mainly Construction theory, Post-modernism theory as well as the though of the Multi-aptitude theory.
本文的理论基础主要是建构主义学习理论和后现代主义学习理论及多元智能理论。
Environmental impact of the industrial comprehensive area is different from that of ordinary construction project, and thus the post project analysis has different characteristics.
工业综合开发区环境影响不同于一般建设项目环境影响,因而后评估具有不同的特点。
The project manager is a very important post to ensure quality, safety, time of a construction project.
项目经理岗位是保证工程建设项目质量、安全、工期的重要岗位。
How should the quality and education level of farmers be enhanced while the hardware has been considerably improved during post-earthquake construction.
灾后重建中在硬件设施得到改善的同时如何提升农民的素质及教育水平。
The floor and ceiling components are constructed out of glulam, the walls are constructed from a beam and post construction planked and insulated on both sides.
地板和天花板组件是胶合构造,墙是建于梁和柱结构的平板,并于两边绝缘。
The structures are simulated as a beam with elastic bearing, then a model is proposed for the analysis of prestressed concrete structures with a strip of post pouring concrete during construction.
将留后浇带预应力混凝土梁模拟为弹性支座梁,研究了留后浇带预应力混凝土结构施工期间的力学性能。
The strengthening mechanism, construction technological proceedings and the main points to be noticed in construction with post grouting technique are given.
介绍了影响泥浆护壁钻孔灌注桩单桩承载力的主要因素,后压浆技术的加固机理、施工工艺流程及施工要点。
The causes of indoor drainage pipeline blockage are analyzed from three aspects of design process, construction methods, post-use maintenance and effective prevention measures are proposed.
从设计过程、施工环节、后期使用维护等三方面分析室内排水管道堵塞的原因,并提出有效地防止措施。
To reach the destination of fully displaying the significance of post-valuation of construction project, the further discussion and case application are made in the article.
通过对项目后评价的进一步探讨和实例应用,以期达到更加充分体现建设项目后评价的意义之目的。
In the management process of construction projects, the status of project post-evaluation has been improved increasingly on the whole international tendency.
在工程建设项目管理过程中,整个国际趋势上项目后评价的地位在不断提高。
Traffic volume forecast and analysis is an important proportion of highway construction feasibility study and post-evaluation.
交通流量预测与分析是公路建设项目可行性研究或后评价的重要组成部分。
Design and construction of high-rising building's post-casting zones is introduced in detail, some existed problems are analyzed and some relative measures are put forward.
本文中较为详细地介绍了高层建筑后浇带的设计与施工,分析了其中存在的问题,提出了具体方法和措施。
It presents the object, function, content and method of the post-assessment on highway construction project, and discusses the significance.
介绍公路建设项目后评价的目的、作用、内容和方法,阐述了公路建设项目后评价的意义。
It presents the object, function, content and method of the post-assessment on highway construction project, and discusses the significance.
介绍公路建设项目后评价的目的、作用、内容和方法,阐述了公路建设项目后评价的意义。
应用推荐