Each level of the building is configured to allow post-construction subdivisions to offer a wide range of office sizes.
建筑每层的构造都允许在建成后进行细分,以提供更多不同面积的办公空间。
The new model presents a new method for analysis and prediction of settlement and it is found to be a good reference to post-construction settlement of embankment in loess areas.
新模型为工后沉降的分析预测提供了一种新的方法,可为今后黄土路堤工后沉降的预测计算提供参考。
The most pivotal technical problem of building high-speed railway on soft soil is strictly controlling post-construction settlement of subgrade and its elastic deformation of top surface.
在软土地基上修建高速铁路,其最关键的技术问题就是严格控制路基的工后沉降及列车高速运行时路基顶面的弹性变形。
Abstract: Highway engineering feasibility study report is critical of the preliminary work of road construction and an important basis for project approval and post-construction drawing design.
摘要:公路工程可行性研究报告是公路建设前期工作的关键,是项目立项和后期施工图设计的重要依据。
The settlement of soft soil foundation which contains rotten wood is fast in convergence after it is deep treated and has a little post-construction settlement.
含腐木的软土地基在进行深层处理后,沉降发生早、收敛快,工后沉降小;
Post-construction settlements controlled by empirical settlement rate standards used in some highways can not be obtained.
现有的沉降速率法主要依据地方经验沉降速率标准,无法与获得的工后沉降相联系。
The reinforcement scheme, structure calculation, post tensioning ironware and construction essentials for the parking garage were introduced in this paper.
本文介绍了该停车库的加固方案、结构计算、后张拉铁件和施工要点。
Through engineering practice and summary, some problems in terms of application of post cast zone for construction were analyzed, and improvement Suggestions were put forward.
通过工程实践总结,对施工后浇带应用方面的一些问题进行了分析,并提出了改进意见。
Environmental impact of the industrial comprehensive area is different from that of ordinary construction project, and thus the post project analysis has different characteristics.
工业综合开发区环境影响不同于一般建设项目环境影响,因而后评估具有不同的特点。
The project manager is a very important post to ensure quality, safety, time of a construction project.
项目经理岗位是保证工程建设项目质量、安全、工期的重要岗位。
The structures are simulated as a beam with elastic bearing, then a model is proposed for the analysis of prestressed concrete structures with a strip of post pouring concrete during construction.
将留后浇带预应力混凝土梁模拟为弹性支座梁,研究了留后浇带预应力混凝土结构施工期间的力学性能。
A scheme of connection between the networking of the command post and the WAN of field is designed, a reference for the construction of the commend post in field is provided.
设计了指挥所组网以及与战场广域网的连接方案,为野战条件下的指挥所网络建设提供了参考。
The strengthening mechanism, construction technological proceedings and the main points to be noticed in construction with post grouting technique are given.
介绍了影响泥浆护壁钻孔灌注桩单桩承载力的主要因素,后压浆技术的加固机理、施工工艺流程及施工要点。
We will intensify the oversight of the use of materials and funds for disaster relief and post-quake reconstruction and ensure the quality of construction projects.
要加强对抗震救灾和灾后恢复重建资金、物资的监管,确保工程建设质量。
Ladies and gentlemen, that is what we did in the Olympic venue construction, the supply of reception services during the games period and the post-games transformation and operation.
女士们,先生们,以上是我们在奥运场馆建设、赛时接待服务和赛后改造运营方面所做的工作和努力。
After the analysis, the dissertation summarizes single and comprehensive post-evaluation method of port construction project.
通过分析,归纳总结出港口建设项目单项和综合后评价方法。
Combining with the Hangzhou Liqun Building project, authors introduce some aspects of the pile-bottom post-grouting technology such as features, construction methods and quality control.
结合杭州利群大厦工程实例,介绍了桩底后压浆技术的特点、施工工艺和质量控制。
The assessment of national economy is one of the main content of the post assessment of construction projects.
国民经济评价是项目后评价的主要内容之一。
The application of WPAN based on the Bluetooth in the construction of command post network is introduced.
介绍了基于蓝牙技术的WPAN在指挥所网络建设中的应用。
A post evaluation index system is presented for the construction project on the basis of the process evaluation, effectiveness evaluation, impact evaluation and sustainability evaluation.
建立基于过程评价、效益评价、影响评价与可持续性评价的工程项目后评价指标体系。
This paper introduces the construction and test techniques for prestressed and post-tensioned negative moment.
介绍了预应力后张法负弯矩的施工与检测技术。
Finally, some results useful to post-tensioned prestressing engineering design and construction are obtained.
最后,通过进一步地综合分析,得到了一些对后张法预应力工程设计、施工的有益结论。
The paper puts forward the common questions of post-tensile prestressed hollow plate beam in construction, and proposes solutions to these problems.
分析后张法预应力空心板梁在施工中常遇到的问题,并提出解决这些问题的方法。
Water conservancy construction project post-evaluation includes course evaluation, economic evaluation, affection appraising, project goal assessment and constant appraisal.
水利建设项目后评价包括过程评价、经济评价、影响评价、项目目标和可持续性评价。
The level of the subject construction in Chinese medicine and pharmacy is directly related to the quality of post-graduate education.
中医药学科建设的水平,直接关系到研究生教育的质量。
Design and construction of high-rising building's post-casting zones is introduced in detail, some existed problems are analyzed and some relative measures are put forward.
本文中较为详细地介绍了高层建筑后浇带的设计与施工,分析了其中存在的问题,提出了具体方法和措施。
Design and construction of high-rising building's post-casting zones is introduced in detail, some existed problems are analyzed and some relative measures are put forward.
本文中较为详细地介绍了高层建筑后浇带的设计与施工,分析了其中存在的问题,提出了具体方法和措施。
应用推荐