The concept of cutting tool life-cycle management was put forward, and divided it into four phases: planning period, input time, serviceable life and discarding period.
提出了刀具全生命周期管理的概念,将刀具全寿命周期管理划分为计划期、投入期、使用期、报废期四个阶段。
A spare plan obtained using the presented method includes the Numbers of spares and timing of each spare in a long term planning period.
用提出的方法所获得的设备备用方案,包括在长期规划期间应购置的备用设备数量和每个备用设备投入的时间。
At present Beijing CBD is in the transition from planning period to construction management period and from industrial planning period to industrial formation period.
目前,北京CBD正从规划建设阶段逐渐向建设管理阶段、由产业规划阶段向形成产业阶段过渡。
The project construction in a long term planning period is determined according to demand in each stage. The model is more close to practice by comparison with the static model.
在一个较长的规划期内,分阶段按需求考虑各项规划工程的建设显然比静态模型的使用更符合实际。
The atmosphere environmental quality, water environmental quality and noise environmental quality of Nanjing during The Ninth Five Years Planning period were surveyed.
对南京市“九五”期间的空气环境质量、水环境质量、声环境质量的状况进行了综述与分析。
The atmosphere environmental quality, water environmental quality and noise environmental quality of Nanjing during The Ninth Five Years Planning period were surveyed.
对南京市“九五”期间的空气环境质量、水环境质量、声环境质量的状况进行了综述与分析。
应用推荐