... Planning, Lands and Works Panel 规划、地政及工程事务委员会 planning period 规划期 planning permission 规划许可 ...
基于60个网页-相关网页
... 三、规划定位 Planning and Positioning 四、规划期限 Planning Period 五、规划规模 Planning Scale ...
基于2个网页-相关网页
repetitive planning period 重复计划期间
general planning period 总体规划阶段
Resource planning period profile 资源计划周期参数文件
period planning [计划] 期间计划
time period power network planning 时限电网规划
planning time period 规划时间周期
fixed-period planning 固定周期法
period of centralized planning 集中计划管理时期
Unusually, then, the change of sovereignty was preceded by a long planning period.
不同寻常的是,主权变更之前是长时间的规划。
The concept of cutting tool life-cycle management was put forward, and divided it into four phases: planning period, input time, serviceable life and discarding period.
提出了刀具全生命周期管理的概念,将刀具全寿命周期管理划分为计划期、投入期、使用期、报废期四个阶段。
A spare plan obtained using the presented method includes the Numbers of spares and timing of each spare in a long term planning period.
用提出的方法所获得的设备备用方案,包括在长期规划期间应购置的备用设备数量和每个备用设备投入的时间。
应用推荐