• Chris: I was previously a mine engineer, it was very different from what I am doing now.

    克里斯:我以前是名采矿工程师,那跟我现在所做的有很大不同。

    youdao

  • For the effect on the control of strata pressure and prevention of rock burst, we need monitor in the mine engineer except the study and compute in the process of mine design.

    为有效控制地压和防治岩爆,除了采矿设计阶段进行计算和分析研究外,还必须在采矿工程中进行实时监测。

    youdao

  • For the effect on the control of strata pressure and prevention of rock burst, we need monitor in the mine engineer except the study and compute in the process of mine design.

    为有效控制地压和防治岩爆,除了采矿设计阶段进行计算和分析研究外,还必须在采矿工程中进行实时监测。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定