It will be certain current significance to underground mine engineer.
对矿山地下工程有一定的指导意义。
Chris: I was previously a mine engineer, it was very different from what I am doing now.
克里斯:我以前是名采矿工程师,那跟我现在所做的有很大不同。
For the effect on the control of strata pressure and prevention of rock burst, we need monitor in the mine engineer except the study and compute in the process of mine design.
为有效控制地压和防治岩爆,除了采矿设计阶段进行计算和分析研究外,还必须在采矿工程中进行实时监测。
应用推荐