When we finish building the Subway Line 3, it will be easier to travel around the city.
当我们完成地铁3号线的建设后,环游城市将会更容易。
Get the name of a process to check and assign it to a variable (line 3).
获得要检查的进程的名称,并将其分配给一个变量(第3行)。
The last six lines are contextually weak, and line 3 represents nothing but context.
最后六行的上下文不很明确,第3行只表示上下文。
This command would find the first word on line 3 in the file shown in Listing 6.
这个命令会找到清单6所示文件的第3行的第一个单词。
Punyu Square. This is the end of the main line of Line 3, thank you for traveling on the metro.
番禺广场,呢个系三号主线嘅尾站,多谢乘搭地铁。
EntityManager is the factory that constructs an executable query instance given a JPQL string (line 3).
EntityManager是构造一个包含给定j PQ l字符串的可执行查询实例的工厂(第3行)。
Then, line 3 starts the table definition, and the 4 following lines define the column widths in this table.
然后,第 3行则启动表定义,而紧接着的4行定义该表中的列宽。
Tinho Bus Station. This is the end of the branch line of line 3, thank you for traveling on the metro.
天河客运站,呢个系三号支线嘅尾站,多谢乘搭地铁。
You can take Line 3 to Lao Jie Station, and then transfer to Line 1 to Shen Da Station. You can't miss it.
你可以乘坐龙岗线到老街站,然后换乘1号线到深大站,就到了。
It is here at line 3 that the dispatching to the root deserializer occurs, when the unmarshall method is called.
当调用unmarshall方法时,就是在第3行这里发生到根序列化器的调度。
The calculation of the operational reliability is applied to Shanghai Rail Transit Line 1, Line 2 and Line 3.
应用该方法计算了上海轨道交通1、2、3号线的可靠性指标。
Line 3 creates a numeric data element based on the definition for element1 in schema1 and the content of field1.
第3行代码基于schema1中element1的定义和field1的内容创建了数值数据元素。
Line 3: The class element is used to specify which set of JARs, class files, or directories you want FindBugs to analyze.
第3行:class元素用于指定要FindBugs分析哪些JAR、类文件或者目录。
Line 3 - This creates a new user with the username as' newusername 'and with the password specified as the second argument.
第3行—以用户名“newusername”和第二个参数指定的密码创建一个新用户。
Next station Art Museum, interchange station for Line 3, Line 5, or Line 8 southbound towards Da Hong Men. Please alight on the left.
下一站美术馆东街。乘客可以换乘3 号线、5 号线,或换乘8 号线前往大红门方向沿途各站。请在左边车门下车。
We are now at Nanjing South Railway Station. Doors will open on the right. Transfer is available for Metro Line 3 and Airport Express.
南京南站到了,请不要依靠车门,请从列车前进方向右侧车门下车。此站可换乘地铁3号线和机场线。
The same concept has been successfully applied in Guangzhou Line 3 vehicles, which was also supplied by Siemens and its local partner.
与之相同的模式曾经在广州地铁3号线的列车上成功的引用,这些列车也是由西门子与当地的合作伙伴供应的。
The next station is Nanjing South Railway station. Doors will open on the right. Transfer is available for Metro Line 3 and Airport Express.
前方到站,南京南站,请不要依靠车门,请从列车前进方向右侧车门下车。此站可换乘地铁3号线和机场线。
To experiment difference at before attend train, train three week be over with train six week be over juniors line 3 times all data of test.
对实验者分别在参加训练前、训练三周结束时和训练六周结束后进行3次全部数据的测试。
Or take Metro Line 3 to South Changjiang Road Station and take bus 552 to San Zhuanlu. You can also take bus 232, 726 or 159 to San Zhuanlu.
或乘地铁三号线到长江南路站换乘公交552区间车到“三转炉”车站下车即到,另有公交232、726、159也可到达“三转炉”车站。
The loop including line 3 of the listing is working through the keys received, getting a corresponding value, and printing it as an array or a string.
包含清单第3行的循环将遍历接收到的键,获得相应值,并把它作为数组或字符串输出。
Considering the practical engineering of Guangzhou Metro Line 3 and Line 4, the intelligent low voltage distribution system is briefly introduced.
结合广州地铁3、4号线工程实例,介绍智能低压系统的设计和应用。
If there is only one element in the list (the (CDR args_list) portion on line 2 returns nil), return the single element (the (car args_list) on line 3).
如果列表中只有一个元素(第2行中的(cdr args_list)部分返回nil),则返回单个元素(第3行中的(car args_list))。
Notice in line 3 that, if there are attributes to an element, they should be informed right after the element's name, followed by the element content (line 4).
注意第3行中,如果元素存在某些属性,就应该恰好在元素名称之后,元素内容(第4行)之前告知。
The engineering characteristics, drainage design, layout of wastewater pump stations and equipment control of Guangzhou rail transit line 3 are introduced.
介绍广州市轨道交通3号线的工程特点及全线区间排水设计、废水泵站的设置及设备控制等情况。
Next Station: Hag Cheun. Please change to platform three for Line 3 towards Punyu Square, or to platform four for the Line 3 towards Canton East RailwayStation.
下一站:客村,请到三号月台转乘三号线往番禺广场沿途各站,或四号月台往广州东站沿途各站。
Next Station: Canton East RailwayStation. Please change to platform three for Line 3 towards Punyu Square, or to platform five for the Airport Express towards Airport.
下一站:广州东站,请到三号月台转乘三号线往番禺广场沿途各站,或五台月转乘机场快线往机场沿途各站。
This paper introduces the integration of UPS and intelligent time distribution technique of weak current systems in rail transit and its application in Shenzhen Metro Line 3 .
提出了城市轨道交通采用弱电系统后备电源整合与智能化计时配电管理的设计理念,并在深圳地铁3号线中应用。
This paper introduces the integration of UPS and intelligent time distribution technique of weak current systems in rail transit and its application in Shenzhen Metro Line 3 .
提出了城市轨道交通采用弱电系统后备电源整合与智能化计时配电管理的设计理念,并在深圳地铁3号线中应用。
应用推荐