• The robots on Line 3 have gone wrong.

    3号线的机器人出故障了。

    youdao

  • When we finish building the Subway Line 3, it will be easier to travel around the city.

    当我们完成地铁3号线的建设后,环游城市将会更容易。

    youdao

  • The actual update happens on line 3.

    实际的更新发生在第3行。

    youdao

  • How can I get to Metro Line 3?

    我怎样才能到达地铁3号线?

    youdao

  • This corresponds to line 3 in Figure 1.

    这与图1中的第3行相对应。

    youdao

  • You must add the route in line 3 manually.

    您必须在第三行手动添加路径。

    youdao

  • Where can I change to Line 3, please?

    请问在哪里可以换乘龙岗线?

    youdao

  • This would be defined with a new trend line 3.

    这将受到新的趋势线3的限定。

    youdao

  • Line 3 allows the index to use English morphology.

    第3行将允许索引使用英文词法。

    youdao

  • There is a misprint in line 3 from the top of the page.

    从页码顶上往下数第3行中有个印错的字。

    youdao

  • Get the name of a process to check and assign it to a variable (line 3).

    获得要检查的进程的名称,并将其分配给一个变量(第3行)。

    youdao

  • Hello, I'm Yang, an employee of Shenzhen Metro Line 3. Nice to meet you!

    您好,我是杨,是深圳地铁三号线的员工。很高兴认识您!

    youdao

  • The last six lines are contextually weak, and line 3 represents nothing but context.

    最后六行的上下文不很明确,第3行只表示上下文。

    youdao

  • This command would find the first word on line 3 in the file shown in Listing 6.

    这个命令会找到清单6所示文件的第3行的第一个单词。

    youdao

  • At line 3, I build (compile and link) the application with the instrumentation source (instrument.c).

    在第3行中,我使用检测源(instrument . c)来构建(编译并连接)应用程序。

    youdao

  • EntityManager is the factory that constructs an executable query instance given a JPQL string (line 3).

    EntityManager是构造一个包含给定j PQ l字符串的可执行查询实例的工厂(第3行)。

    youdao

  • Then, line 3 starts the table definition, and the 4 following lines define the column widths in this table.

    然后,第 3行则启动表定义,而紧接着的4行定义该表中的列宽。

    youdao

  • You can take Line 3 to Lao Jie Station, and then transfer to Line 1 to Shen Da Station. You can't miss it.

    你可以乘坐龙岗线到老街站,然后换乘1号线到深大站,就到了。

    youdao

  • It is here at line 3 that the dispatching to the root deserializer occurs, when the unmarshall method is called.

    当调用unmarshall方法时,就是在第3行这里发生到根序列化器的调度。

    youdao

  • The calculation of the operational reliability is applied to Shanghai Rail Transit Line 1, Line 2 and Line 3.

    应用该方法计算了上海轨道交通1、2、3号线的可靠性指标。

    youdao

  • Line 3 creates a numeric data element based on the definition for element1 in schema1 and the content of field1.

    第3行代码基于schema1中element1的定义和field1的内容创建了数值数据元素。

    youdao

  • However, it will take more than an hour and a half to transfer from the bus to the subway and from subway line 3 to line 2.

    坐公交车?但是要从公交车站到地铁站,坐3号线再倒2号线的话,最少需要1个半小时。

    youdao

  • Line 3: The class element is used to specify which set of JARs, class files, or directories you want FindBugs to analyze.

    第3行:class元素用于指定要FindBugs分析哪些JAR、类文件或者目录。

    youdao

  • Line 3 - This creates a new user with the username as' newusername 'and with the password specified as the second argument.

    第3行—以用户名“newusername”和第二个参数指定的密码创建一个新用户。

    youdao

  • Next station Art Museum, interchange station for Line 3, Line 5, or Line 8 southbound towards Da Hong Men. Please alight on the left.

    下一站美术馆东街。乘客可以换乘3 号线、5 号线,或换乘8 号线前往大红门方向沿途各站。请在左边车门下车。

    youdao

  • We are now at Nanjing South Railway Station. Doors will open on the right. Transfer is available for Metro Line 3 and Airport Express.

    南京南站到了,请不要依靠车门,请从列车前进方向右侧车门下车。此站可换乘地铁3号线和机场线。

    youdao

  • The same concept has been successfully applied in Guangzhou Line 3 vehicles, which was also supplied by Siemens and its local partner.

    与之相同的模式曾经在广州地铁3号线的列车上成功的引用,这些列车也是由西门子与当地的合作伙伴供应的。

    youdao

  • The next station is Nanjing South Railway station. Doors will open on the right. Transfer is available for Metro Line 3 and Airport Express.

    前方到站,南京南站,请不要依靠车门,请从列车前进方向右侧车门下车。此站可换乘地铁3号线和机场线。

    youdao

  • Or take Metro Line 3 to South Changjiang Road Station and take bus 552 to San Zhuanlu. You can also take bus 232, 726 or 159 to San Zhuanlu.

    或乘地铁三号线到长江南路站换乘公交552区间车到“三转炉”车站下车即到,另有公交232、726、159也可到达“三转炉”车站。

    youdao

  • Or take Metro Line 3 to South Changjiang Road Station and take bus 552 to San Zhuanlu. You can also take bus 232, 726 or 159 to San Zhuanlu.

    或乘地铁三号线到长江南路站换乘公交552区间车到“三转炉”车站下车即到,另有公交232、726、159也可到达“三转炉”车站。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定