• The presented scenario shows collaboration in the context of engineering change order.

    视频展示了在工程变更单情景下的协作。

    youdao

  • Fabric provides a business process for specifying and deciding on engineering change requests (ECRs) at the engineering change phase.

    Fabric提供一个业务流程以在工程变更阶段指定和选定工程变更请求(ECRs)。

    youdao

  • Construction organizations should recognize the importance of engineering change, arrange high-quality personnel, and use strategies in reason to implement the work of engineering change well.

    施工单位应认识到工程变更的重要性,安排高素质人员,合理运用策略,做好工程变更工作。

    youdao

  • Abstract: in the process of project construction, because all sorts of reasons, engineering change situation happen from time to tome.

    摘要:在工程建设过程中,由于各种原因,工程变更的情况时有发生。

    youdao

  • The paper explains the cause of expressway engineering change, and presents the measures to control the expressway engineering change.

    通过对高速公路工程变更的原因进行分析,提出了一些控制高速公路工程变更的对策、措施。

    youdao

  • Engineering Dept. must inform each engineering change with formal documents to Quality Dept. Production Dept. and Material Dept. timely.

    每一个工程技术更改必须由技术部以正式的文件及时通知质量,生产,材料部门。

    youdao

  • Built and maintain BOM (bill of material) for new product and update it in case of engineering change or other requirement by related dept.

    进行新产品BOM(物料清单)表的建立与维护,根据工程变更或相关部门要求进行更新。

    youdao

  • Own product ECR and ECO for yield improvement, quality improvement and customer requirement. Review and approve owned product engineering change.

    负责产品ECR与ECO,以满足产品良率提升、品质提升和客户需求。

    youdao

  • Based on modern information economics, dissymmetry information phenomenon between main bodies of project and its influences on engineering change risks are analyzed.

    运用现代信息经济学的信息不对称理论分析了建设项目主体之间的信息不对称现象及其对工程变更风险的影响。

    youdao

  • Receiving engineering change information and operating accordingly in material management system to reflect the change information (part level/usage/structure, etc).

    接收工程师在工程发布系统中的指令,在物料系统中进行操作,如实反映变更的信息(零件级别、用量,结构等)。

    youdao

  • Abstract:First, based on the incomplete contract theory, summarizes the main factors of difference of quantities that including the engineering change, List missing item and quantity deviation.

    摘要:首先,基于不完全契约理论,总结引起工程量差异的工程量清单缺项、工程变更等主要因素;

    youdao

  • By analyzing the risk factors in the engineering change process of the automotive components, this paper establishes the analysis models of the risk factors in the engineering change processes.

    深入分析了汽车零部件产品工程更改风险因素,建立了工程更改风险因素分析模型。

    youdao

  • Defines and issues alterations of parts and part lists according to Engineering Change Requests.

    根据工程变更申请定义和发布零件及零件清单。

    youdao

  • Approve all technical changes (BCP internal), Follow up and sometimes approve Engineering change.

    批准所有技术变更(BCP内部),跟踪和有时批准工程变更。

    youdao

  • Engineering change management, which is basis on product data management (PDM) system, controls the pre-released and released product data.

    建立在产品数据管理系统基础上的工程变更管理是指管理处于预发布和发布生命周期状态的产品数据。

    youdao

  • Engineering change management, which is basis on product data management (PDM) system, controls the pre-released and released product data.

    建立在产品数据管理系统基础上的工程变更管理是指管理处于预发布和发布生命周期状态的产品数据。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定