• Product Engineering change activity.

    产品工程变更

    youdao

  • The presented scenario shows collaboration in the context of engineering change order.

    视频展示了工程变更情景下协作

    youdao

  • The Research of Engineering Change Management in Collaborative Working Environment;

    有利于解决问题工作环境

    youdao

  • Engineering change management. To register EC No. , track status and record the document.

    负责工程变更编号的发放与管理,工程变更的状态跟踪文件存档;

    youdao

  • Defines and issues alterations of parts and part lists according to Engineering Change Requests.

    根据工程变更申请定义发布零件零件清单

    youdao

  • Approve all technical changes (BCP internal), Follow up and sometimes approve Engineering change.

    批准所有技术变更(BCP内部),跟踪有时批准工程变更

    youdao

  • Cost effectively enhance paperless reporting for manufacturing, nonconformances and Engineering Change management.

    低成本增强制造过程、不合格品工程变更管理无纸化报告;\ n ?

    youdao

  • Abstract: the rules of the engineering change in Contract law are not congruent with the theory and practice of that.

    [摘要]合同法学说实务工程变更观点不尽一致。

    youdao

  • Fabric provides a business process for specifying and deciding on engineering change requests (ECRs) at the engineering change phase.

    Fabric提供一个业务流程工程变更阶段指定选定工程变更请求(ECRs)。

    youdao

  • Therefore, from the perspective of risk management, contractor should pay attention to risk management in the engineering change.

    因此需要承包商风险管理角度出发,重视工程变更中的风险管理。

    youdao

  • Abstract: in the process of project construction, because all sorts of reasons, engineering change situation happen from time to tome.

    摘要工程建设过程中,由于各种原因工程变更情况时有发生

    youdao

  • The paper explains the cause of expressway engineering change, and presents the measures to control the expressway engineering change.

    通过高速公路工程变更原因进行分析,提出了一些控制高速公路工程变更的对策、措施。

    youdao

  • Engineering Dept. must inform each engineering change with formal documents to Quality Dept. Production Dept. and Material Dept. timely.

    每一个工程技术更改必须技术部正式文件及时通知质量生产材料部门。

    youdao

  • Built and maintain BOM (bill of material) for new product and update it in case of engineering change or other requirement by related dept.

    进行产品BOM(物料清单)表建立维护,根据工程变更相关部门要求进行更新

    youdao

  • Engineering change management, which is basis on product data management (PDM) system, controls the pre-released and released product data.

    建立在产品数据管理系统基础上的工程变更管理指管理处于发布发布生命周期状态的产品数据。

    youdao

  • Own product ECR and ECO for yield improvement, quality improvement and customer requirement. Review and approve owned product engineering change.

    负责产品ECRECO,以满足产品提升品质提升客户需求

    youdao

  • In the project construction, most risks come from engineering change, while contractors play an important position in the whole construction process.

    项目施工很多风险来自工程变更承包商整个施工过程中占有很重要位置

    youdao

  • Based on modern information economics, dissymmetry information phenomenon between main bodies of project and its influences on engineering change risks are analyzed.

    运用现代信息经济学的信息不对称理论分析了建设项目主体之间的信息不对称现象及其工程变更风险影响

    youdao

  • Receiving engineering change information and operating accordingly in material management system to reflect the change information (part level/usage/structure, etc).

    接收工程师工程发布系统中的指令,在物料系统中进行操作如实反映变更信息零件级别用量结构)。

    youdao

  • During the long period, It is believed that the mainly reason is the engineering change which results in schedule delay and cost overruns of the construction project.

    这个较长的建设周期内工程变更认为导致项目工期延迟费用超支主要原因工程建设项目管理过程中倍受重视。

    youdao

  • Software maintenance is framed by fundamental Agile concepts: working from a backlog of prioritized tickets or engineering change orders, and delivering incremental releases of working software.

    软件维护基本敏捷概念所包裹:优先考虑的候选库开始工作或者改变次序并且交付工作软件的增量发布

    youdao

  • Construction organizations should recognize the importance of engineering change, arrange high-quality personnel, and use strategies in reason to implement the work of engineering change well.

    施工单位认识工程变更重要性安排高素质人员合理运用策略,做好工程变更工作

    youdao

  • Abstract:First, based on the incomplete contract theory, summarizes the main factors of difference of quantities that including the engineering change, List missing item and quantity deviation.

    摘要首先基于不完全契约理论总结引起工程量差异工程量清单工程变更主要因素

    youdao

  • By analyzing the risk factors in the engineering change process of the automotive components, this paper establishes the analysis models of the risk factors in the engineering change processes.

    深入分析汽车零部件产品工程更改风险因素建立了工程更改风险因素分析模型

    youdao

  • We need to change the way we teach engineering to make it an enjoyable experience for students.

    我们需要改变教授工程学方式成为学生们一次愉快经历

    youdao

  • During the Engineering stage we try to avoid burdening the users with change control procedures.

    工程阶段期间我们试图避免通过改变控制程序加重用户的负担。

    youdao

  • Change control management allows for flexibility, and at the same time, promotes disciplined engineering principles.

    更改控制管理可以提供灵活性,同时有助于实现严谨工程原则。

    youdao

  • As we have noted, a challenge of working in software engineering is the need to respond to constant change.

    正如我们提到的,软件工程师工作挑战之一需要对不断发生的变化做出响应

    youdao

  • It's important to get this work done before we start coding, because it's very disruptive to change engineering processes mid-stream.

    开始编码之前这个很重要的。因为工程进度的中间改变,是非常具有破坏性的。

    youdao

  • It's important to get this work done before we start coding, because it's very disruptive to change engineering processes mid-stream.

    开始编码之前这个很重要的。因为工程进度的中间改变,是非常具有破坏性的。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定