• To control the engineering quality cost control, the following work should be carried out: quality cost projection, plan, accounting, analysis, assessment and report.

    开展工程质量成本控制,应做好质量成本预测、计划、核算、分析、考核和报告等工作。

    youdao

  • This thesis finished the module of CAE analysis report which is on the basis of Z-MOLD developed by Advanced Polymer Processing Technology of National Engineering Researing Center.

    本文在橡塑模具国家工程研究中心自主版权Z-MOLD的基础上,完成了CAE分析结果报告的模块研制;

    youdao

  • This thesis finished the module of CAE analysis report which is on the basis of Z-MOLD developed by Advanced Polymer Processing Technology of National Engineering Researing Center.

    本文在橡塑模具国家工程研究中心自主版权Z-MOLD的基础上,完成了CAE分析结果报告的模块研制;

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定