To control the engineering quality cost control, the following work should be carried out: quality cost projection, plan, accounting, analysis, assessment and report.
开展工程质量成本控制,应做好质量成本预测、计划、核算、分析、考核和报告等工作。
This thesis finished the module of CAE analysis report which is on the basis of Z-MOLD developed by Advanced Polymer Processing Technology of National Engineering Researing Center.
本文在橡塑模具国家工程研究中心自主版权Z-MOLD的基础上,完成了CAE分析结果报告的模块研制;
应用推荐