The critical chain technique is a new application of theory of constraints to the project management.
关键链技术是约束理论在项目管理中的新应用。
This paper illustrates the goal and significance of identifying critical chain in project scheduling, and analyzes the drawbacks introduced by the conventional project scheduling methods.
本文阐述了项目进度计划中,确定关键链的目的及意义,深入分析了传统项目计划方法存在的问题。
The WAPI project schedule control is based on critical chain project management. The core is the management and controlling of buffer.
WAPI项目进度控制是基于关键链管理的进度控制,核心是对缓冲的管理和控制。
Buffer sizing is the breakthrough of critical chain in the area of project schedule management, and it makes a practical application on monitoring project.
缓冲区设置是关键链法在项目进度管理领域的一个技术突破,通过缓冲区对项目进度进行监控具有实际应用意义。
Applying the supply chain management and the critical chain project management in the EPC project is advantageous to guard against the risk and the uncertainties.
供应链管理和关键链项目管理在EPC项目中的并用,有利于防范工程项目的风险与不确定性。
The methods of identifying critical chain with the goals of minimum project duration and duration-cost tradeoff are put forward. Finally a scheduling example is given to prove the methods' validity.
然后,以工期最小为目标与工期-成本权衡目标建立关键链识别方法模型,并通过算例验证了该方法的有效性。
The above discussion lies at the heart of the argument promoting the Critical Chain Method (CCM).
上述讨论涉及到了关于提倡关键链法(Critical Chain Method,CCM)的争论核心。
During the implementation of system, a new method of project management called Critical Chain project management (CCPM) was used to improve the quality of project planning.
在系统实现过程中,融入了关键链项目管理的方法,提高了项目计划制定的质量。
During the implementation of system, a new method of project management called Critical Chain project management (CCPM) was used to improve the quality of project planning.
在系统实现过程中,融入了关键链项目管理的方法,提高了项目计划制定的质量。