• The critical chain technique is a new application of theory of constraints to the project management.

    关键链技术是约束理论在项目管理中的新应用。

    youdao

  • This paper illustrates the goal and significance of identifying critical chain in project scheduling, and analyzes the drawbacks introduced by the conventional project scheduling methods.

    本文阐述了项目进度计划中,确定关键链的目的及意义,深入分析了传统项目计划方法存在的问题。

    youdao

  • The construction cost control method based upon critical chain theory is testified by an example.

    通过实例验证了基于关键链的工程造价控制方法。

    youdao

  • The WAPI project schedule control is based on critical chain project management. The core is the management and controlling of buffer.

    WAPI项目进度控制是基于关键链管理的进度控制,核心是对缓冲的管理和控制。

    youdao

  • Buffer sizing is the breakthrough of critical chain in the area of project schedule management, and it makes a practical application on monitoring project.

    缓冲区设置是关键链法在项目进度管理领域的一个技术突破,通过缓冲区对项目进度进行监控具有实际应用意义。

    youdao

  • Applying the supply chain management and the critical chain project management in the EPC project is advantageous to guard against the risk and the uncertainties.

    供应链管理和关键链项目管理在EPC项目中的并用,有利于防范工程项目的风险与不确定性。

    youdao

  • The methods of identifying critical chain with the goals of minimum project duration and duration-cost tradeoff are put forward. Finally a scheduling example is given to prove the methods' validity.

    然后,以工期最小为目标与工期-成本权衡目标建立关键链识别方法模型,并通过算例验证了该方法的有效性。

    youdao

  • The methodology of Critical Chain Theory is the application in project management.

    关键链项目管理方法是约束理论在项目管理中的应用。

    youdao

  • The above discussion lies at the heart of the argument promoting the Critical Chain Method (CCM).

    上述讨论涉及到了关于提倡关键链法(Critical Chain Method,CCM)的争论核心。

    youdao

  • During the implementation of system, a new method of project management called Critical Chain project management (CCPM) was used to improve the quality of project planning.

    在系统实现过程中,融入了关键链项目管理的方法,提高了项目计划制定的质量。

    youdao

  • During the implementation of system, a new method of project management called Critical Chain project management (CCPM) was used to improve the quality of project planning.

    在系统实现过程中,融入了关键链项目管理的方法,提高了项目计划制定的质量。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定