• He says: "all the engineering is basically done and the Arctic rig concept is close to completion, so it is really only a matter of finding the right prospect and the right client."

    他说:“目前,关于制造该钻井船的准备工作基本完成,设计方案也已接近尾声,最后的一步就是要寻找一个好的发展前景和适合的用户。”

    youdao

  • Stop for 15-40min (depending on the depth of holes) after completion of drilling, and use the drilling rig to get out the impurities such as sand, etc. settled without controlling the mud.

    钻进完成后,停15-40分钟后,(根据孔深决定时间)用钻机打捞一次沉降下去的砂子等杂质,不要控浆。

    youdao

  • Stop for 15-40min (depending on the depth of holes) after completion of drilling, and use the drilling rig to get out the impurities such as sand, etc. settled without controlling the mud.

    钻进完成后,停15-40分钟后,(根据孔深决定时间)用钻机打捞一次沉降下去的砂子等杂质,不要控浆。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定